Laserfiche WebLink
Technical Information Report July 2015 <br /> Everett Public Storage <br /> o Minimum Requirement #5: On-Site Stormwater Management <br /> In the City of Everett, projects are required to implement on-site stormwater <br /> management BMPs to infiltrate, disperse, and retain stormwater runoff on-site to the <br /> maximum extent feasible without causing flooding, groundwater contamination, or <br /> erosion impacts. No specific on-site stormwater management features are proposed <br /> for the project site. A wet/detention vault is proposed for the project as described in <br /> Section 2.0. <br /> o Minimum Requirement #6: Runoff Treatment <br /> Water quality treatment is proposed and sized per Chapter 7 of the City of Everett <br /> SMM. See Section 4.2 Water Quality Treatment Design Analysis for details. <br /> o Minimum Requirement #7: Flow Control <br /> Stormwater discharges from the new and replaced impervious areas shall match <br /> developed discharge durations to pre-developed durations for the range of pre- <br /> developed discharge rates from 50% of the 2-year peak flow up to the full 50-year <br /> peak flow. The pre-developed condition to be matched shall be a forested land <br /> cover. Based on the City's Historical Land Cover Map, the site is located in the <br /> forested land cover area. A detention vault is proposed and sized per Chapter 3 — <br /> Detention Facilities of the City of Everett SMM. <br /> o Minimum Requirement #8: Wetland Protection <br /> There are no wetlands on-site or impacted by the proposed project. <br /> o Minimum Requirement #9: Operation and Maintenance <br /> A copy of the O&M manual shall be retained on-site or within reasonable access to <br /> the site. See Appendix B for Operation and Maintenance Manual. <br /> 14114 Everett Storage TIR Revised 0715.doc 10 is <br />