Laserfiche WebLink
Technical Information Report July 2015 <br /> Everett Self-Storage <br /> • Keep runoff velocities low. <br /> • Retain sediment on-site. <br /> • Thoroughly monitor site and maintain all ESC measures. <br /> • Schedule major earthwork during the dry season. <br /> In addition, project management will incorporate the key components listed below. BMPs to be <br /> implemented to manage the project include: <br /> • Certified Erosion and Sediment Control Lead (BMP C160) <br /> As this project site is located in Wood Creek Basin — Snohomish River Watershed, the project will be <br /> managed according to the following key project components: <br /> Phasing of Construction: Estimated construction is summer of 2015. <br /> Seasonal Work Limitations: <br /> • From October 1 through April 30, clearing, grading, and other soil disturbing activities shall <br /> only be permitted if shown to the satisfaction of the local permitting authority that silt-laden <br /> runoff will be prevented from leaving the site through a combination of the following: <br /> o Site conditions including existing vegetative coverage, slope, soil type, and proximity <br /> to receiving waters; <br /> o Limitations on activities and the extent of disturbed areas; and <br /> o Proposed erosion and sediment control measures. <br /> • Based on the information provided and/or local weather conditions, the local permitting <br /> authority may expand or restrict the seasonal limitation on-site disturbance. <br /> • The following activities are exempt from the seasonal clearing and grading limitations: <br /> o Routine maintenance and necessary repair of erosion and sediment control BMPs; <br /> o Routine maintenance of public facilities or existing utility structures that do not expose <br /> the soil or result in the removal of the vegetative cover to soil; and <br /> o Activities where there is 100p ercent infiltration of surface water runoff within the site <br /> in approved and installed erosion and sediment control facilities. <br /> Coordination with Utilities and Other Jurisdictions <br /> • Care has been taken to coordinate with utilities, other construction projects, and the local <br /> jurisdiction in preparing this SWPPP and scheduling the construction work. <br /> Inspection and Monitoring <br /> • All BMPs shall be inspected, maintained, and repaired as needed to assure continued <br /> performance of their intended function. Site inspections shall be conducted by a person who <br /> is knowledgeable in the principles and practices of erosion and sediment control. This <br /> person has the necessary skills to: <br /> o Assess the site conditions and construction activities that could impact the quality of <br /> stormwater; and <br /> 14114 Everett Storage TIR Revised 0715.doc 38 <br />