My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8407 BROADWAY STADIUM STORAGE 2017-06-20
>
Address Records
>
BROADWAY
>
8407
>
STADIUM STORAGE
>
8407 BROADWAY STADIUM STORAGE 2017-06-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2017 10:56:23 AM
Creation date
6/9/2017 2:32:59 PM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
8407
Tenant Name
STADIUM STORAGE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
259
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Technical Information Report July 2015 <br /> Everett Self-Storage <br /> • Keep runoff velocities low. <br /> • Retain sediment on-site. <br /> • Thoroughly monitor site and maintain all ESC measures. <br /> • Schedule major earthwork during the dry season. <br /> In addition, project management will incorporate the key components listed below. BMPs to be <br /> implemented to manage the project include: <br /> • Certified Erosion and Sediment Control Lead (BMP C160) <br /> As this project site is located in Wood Creek Basin — Snohomish River Watershed, the project will be <br /> managed according to the following key project components: <br /> Phasing of Construction: Estimated construction is summer of 2015. <br /> Seasonal Work Limitations: <br /> • From October 1 through April 30, clearing, grading, and other soil disturbing activities shall <br /> only be permitted if shown to the satisfaction of the local permitting authority that silt-laden <br /> runoff will be prevented from leaving the site through a combination of the following: <br /> o Site conditions including existing vegetative coverage, slope, soil type, and proximity <br /> to receiving waters; <br /> o Limitations on activities and the extent of disturbed areas; and <br /> o Proposed erosion and sediment control measures. <br /> • Based on the information provided and/or local weather conditions, the local permitting <br /> authority may expand or restrict the seasonal limitation on-site disturbance. <br /> • The following activities are exempt from the seasonal clearing and grading limitations: <br /> o Routine maintenance and necessary repair of erosion and sediment control BMPs; <br /> o Routine maintenance of public facilities or existing utility structures that do not expose <br /> the soil or result in the removal of the vegetative cover to soil; and <br /> o Activities where there is 100p ercent infiltration of surface water runoff within the site <br /> in approved and installed erosion and sediment control facilities. <br /> Coordination with Utilities and Other Jurisdictions <br /> • Care has been taken to coordinate with utilities, other construction projects, and the local <br /> jurisdiction in preparing this SWPPP and scheduling the construction work. <br /> Inspection and Monitoring <br /> • All BMPs shall be inspected, maintained, and repaired as needed to assure continued <br /> performance of their intended function. Site inspections shall be conducted by a person who <br /> is knowledgeable in the principles and practices of erosion and sediment control. This <br /> person has the necessary skills to: <br /> o Assess the site conditions and construction activities that could impact the quality of <br /> stormwater; and <br /> 14114 Everett Storage TIR Revised 0715.doc 38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.