Laserfiche WebLink
CHAPTER 7 <br />Implementation Activities <br />Action Time frame Implementor Comments <br />LAND USE ACTIONS <br />L-1 <br />Rezone all of downtown core to <br />Concurrent <br />City <br />Downtown Business (B-3). <br />with plan <br />L-2 <br />Update the provisions of the B-3 zone. <br />Concurrent <br />City <br />with plan <br />L-3 <br />Revise sign standards for the B-3 zone. <br />Concurrent <br />City <br />with plan <br />L-4 <br />Conduct historic preservation activities. <br />Complete: <br />City <br />1 year <br />TRANSPORTATION <br />T-1 <br />Plan and implement Downtown Everett <br />1-2 years <br />City/ET, <br />TMA should manage downtown parking as well <br />Transportation Management <br />with DEA <br />as promoting transit, carpools, vanpools, and <br />Association (TMA). <br />non -motorized modes. <br />T-2 <br />Plan and implement on -street parking <br />2-5 years <br />City, with <br />Revenues from on -street parking must be <br />management using pay stations. <br />TMA/DEA <br />directed back into improving streets and <br />maintaining downtown facilities for business <br />enhancement. Everpark Garage could be <br />included. <br />T-3 <br />Revise the development code to <br />Concurrent <br />City <br />eliminate the minimum parking <br />with plan <br />requirement for commercial buildings. <br />T-4 <br />Revise the development code to require <br />Concurrent <br />City <br />secure bicycle parking and shower/ <br />with plan <br />locker amenities for commercial <br />buildings. <br />T-5 <br />Design and construct bicycle lanes on <br />2-5 years <br />City <br />Could occur with redevelopment of adjacent <br />Hoyt Avenue from 23`d Street to south <br />properties and improvements to the streetscape. <br />of downtown. <br />102 MAKERS architecture and urban design <br />0509_rpt_draft.doc - 6/29/06 <br />