My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 2921-06
>
Ordinances
>
Ordinance 2921-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2015 4:08:17 PM
Creation date
9/10/2015 4:37:13 PM
Metadata
Fields
Template:
Ordinances
Ordinance Number
2921-06
Date
7/26/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PLAN IMPLEMENTATION <br />Action Time frame Implementor Comments <br />T-6 <br />Design and construct bicycle lanes on <br />5-10 years <br />City <br />Could occur with redevelopment of adjacent <br />California Street from Harborfront Trail <br />properties and improvements to the streetscape. <br />to SR 2 Trestle Trail (Hewitt at 1-5). <br />T-7 <br />Complete the Wall Street pedestrian <br />2-5 years <br />City <br />Could occur with redevelopment of adjacent <br />connection east of Broadway to Everett <br />properties. <br />Station via Pacific Avenue underpass. <br />T-8 <br />Design and construct transit -oriented <br />5-10 years <br />City <br />Should occur with redevelopment of adjacent <br />improvements on Rucker Avenue south <br />properties and streetscape improvements to <br />of Hewitt Avenue. <br />Rucker Avenue. <br />T-9 <br />Plan and design high-capacity transit on <br />5-15 years <br />City/Everett <br />Broadway from Everett Station to <br />Transit/Sound <br />Everett Community College. <br />Transit <br />T-10 <br />Plan for other Bus Rapid Transit (BRT) <br />2-5 years <br />City <br />Plan for BRT services from SR -99 via Colby <br />and streetcar services in the downtown. <br />avenue and investigate streetcar services on <br />Hewitt Avenue from riverfront to waterfront. <br />T-11 <br />Redesign Rucker north of Pacific and <br />1-2 years <br />City <br />North of Pacific, build Rucker as a four lane road <br />investigate a realignment of Rucker <br />with medians and parking pockets similar to <br />Avenue south of Pacific to West Marine <br />Hewitt <br />View Drive. <br />STREETSCAPE <br />S-1 <br />Establish a system of conceptual street <br />Initiate: 1 year <br />City <br />Refine the recommendations in this plan. <br />designs and improvement strategies for <br />Complete: <br />downtown streets. <br />1 year <br />S-2 <br />Undertake a program to upgrade <br />Complete: <br />City (perhaps with <br />Streetscape needs median, bulbs, lights, and <br />Rucker Avenue. <br />3-4 years <br />property owner <br />trees. Consider LID contribution. <br />participation) <br />S-3 <br />Undertake a program to upgrade <br />2-10 years <br />City (perhaps with <br />Improvements vary with the street. <br />Connector Streets. <br />property owner <br />participation) <br />EVERETT DOWNTOWN PLAN — DRAFT 6/29/2006 103 <br />
The URL can be used to link to this page
Your browser does not support the video tag.