Laserfiche WebLink
. <br /> `a# Residential Photovoltaic OTC Permit Application <br /> Contractors can apply for an Over-The-Counter(OTC)permit where the Pvsystem meets the requirements listed <br /> in this Checklist.All project plans and supporting documentation must be provlded on site for the Inspector. <br /> --------TO BE COMPLETED BY APPLICANT------- <br /> 0 Project information <br /> Property Owner Name: Ron van der Medlen <br /> Project Address: 1714 Edgemoor Lane Parcel# <br /> Clt Everett State; WA ZIP: �82 — <br /> Day Phone: (425)330-0158 <br /> Contractor Name NW Wind & Solar /SME Inc. of Seattle <br /> Contractor License#; SME INS*0 6 6DB <br /> Contractor Day Phone: (2 0 6) 3 91-2 60 3 <br /> PV system description 6 . OKWDC rooftop PV system. <br /> (Include manufacturer iTek 300SE <br /> and model It of PV Blue Frog YC500 <br /> modules and <br /> Inverters): <br /> )Dote rmille [f taut•project qual[f[es for expedited [ael-mitting; - <br /> Yes No <br /> 1, PV system is designed and proposed for a detached one-or two-family dwelling or <br /> townhouse not more than three stories above grade or detached accessory structure that ❑ <br /> Is code compliant to setbacks and helght,or code allows expansion of nonconformity for <br /> solar modules. [IRC 101.2] <br /> 2. Modules on pitched roofs do not exceed the highest point of the roof unless approved by <br /> the local jurisdiction, <br /> 3. Rooftop is made from lightweight material such'as a single layer of composition shingles, <br /> metal roofing,lightweight masonry,or cedar shingles, <br /> 4. The Installation shall comply with the manufacturer's Instructions.[IRC M2302,2) ❑ <br /> 5. The Installation shall meetthe requirements of NFPA 70 National Electric Code,and all <br /> required electrical permit(s)must be obtained from the Authority Having Jurisdiction to M El <br /> administer the electrical code.[IRC M2302.2] <br /> 6. The Installation shall meet the requirements of the International Fire Code as amended — ® El <br /> by WA State.[IRC M2302,21 <br /> 7, The PV system is designed for the wind speed of the local area,and will be installed per ® Q <br /> the manufacturer's specifications.[IRC M2302,2.1(1)] <br /> 8,� The ground snow load does not exceed 70 pounds per square foot.[IRC M2302,2.1(2)] r9 ❑ <br /> 9. Total dead load of modules,supports,mountings,raceways and all other appurtenances <br /> weigh no more than-four pounds persquare foot,[IRC M2302,2,1(3)] G ❑ <br /> Enter total dead load of system(lbs/ft2):, 2 . 9psf <br /> 10. To address uplift,modules are mounted no higher than 18"above the surface of the N ❑ <br /> roofing to which they are affixed, [IRC M2302.2.1(4)) <br />