Laserfiche WebLink
t <br /> 13100 amp bus/100 amp main OCPD- 3,840 AC watts,maximum 20 amp Inverter OCPD. <br /> ❑Other-Electrical Permit with Plan Review Required <br /> Note 1:Listed un-oltered factory main/bus combination.Alteration of the panelboard main OCPD will require plan review. <br /> Note 2:The circuit conductors and overcurrent de vices shall be sized to carry not less than 125 percent of the maximum currents <br /> ds calculated in 690.8(A).The rating or setting of overcurrent devices shall be permitted In accordance with 240,4(8)and(C).NEC <br /> 690.8(6)(1) <br /> Note 3:If a panelboard employs a snap switch rated 30 amperes or less In any branch circuit,It cannot be rated more than 200 <br /> amperes unless there is a supply side overcurrent protectlon at 200 amperes or less within the panelboard.This requirement does <br /> not apply to panelboards equipped with circuit breakers.Section 408.36(A)of the NEC. <br /> 7, 1 have attached the following Electrical One-Line Diagram: <br /> ❑Standard Electrical Diagram-6 Strings or Less <br /> OStandard Electrical Diagram-4 Strings or Less <br /> KIStandard Electrical Diagram-Micro Inverter <br /> C]None of the above-Electrical Permit with Plan Review Required <br /> Comments: <br /> t. If you answered yes to all of the above questions,your project qualifies for over the Over-the- <br /> COtlnter electrical permit. <br /> I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws <br /> and ordinances governing this type of work will be completed whether specified herein or not. The granting of a permit does <br /> not presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the <br /> performance of construction. That I am authorized by the owner of this property to perform the work for which application Is <br /> made and I comply with the State Contractors Law 18.27 RCW and 296.200 WAC. <br /> Appilcant Signature: �} 101 <br /> Date: ®� <br /> ApplilcantName(PleasePint): Dickson Harding <br /> ---------TO BE COMPLETED BY CITY STAFF------ <br /> 1,Ql11e <br /> uas for OTC Building Permit? OYes ONo Permit Application 1I: <br /> taff initials Date: <br /> LQu�allllles for Electrical OTC? UYes ONo Permit 9: <br /> nlflals Date: <br /> A <br /> i <br />