My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment 4 Floyd Snider
>
Contracts
>
6 Years Then Destroy
>
2018
>
Amendment 4 Floyd Snider
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2017 10:46:47 AM
Creation date
6/19/2017 10:46:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Floyd Snider
Approval Date
6/15/2017
Council Approval Date
6/7/2017
End Date
6/30/2018
Department
Public Works
Department Project Manager
Mark Sadler
Subject / Project Title
Environmental Support for Deep Water Outfall
Amendment/Change Order
Amendment
Amendment/Change Order Number
4
Total Compensation
$54,065.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett <br /> Floyd Snider Environmental Services <br /> City of Everett <br /> Floyd Snider Environmental Services <br /> Amendment No. 4 to the existing Scope of Work <br /> BACKGROUND <br /> Floyd Snider (F I S) provides environmental consulting services associated with the city's deep <br /> water outfall (formerly shared with Kimberly Clark); and environmental issues associated with <br /> the former Kimberly Clark mill site. In addition to the tasks listed in the original Scope of Work <br /> (Amended by Amendment No. 1 in December 2013). <br /> F IS will provide the following additional services per Amendment No. 4, listed below on a time <br /> and materials basis. <br /> Task 2200—Outfall 100 Sediment Sampling Support (New Task) <br /> Scope: Floyd Snider will conduct the following activities for development and finalization of a <br /> Sediment Sampling Plan, sediment sample collection, and data analysis and reporting: <br /> • Preparation of a draft Sediment Sampling Plan for City review and comment. <br /> o Includes a Quality Assurance Project Plan (QAPP) <br /> o Includes a Health and Safety Plan <br /> • Preparation of a final Sediment Sampling Plan for submittal to DNR. <br /> • Coordination with the sediment sampling contractor, and analytical laboratory <br /> contracted to the City. <br /> • Field preparation and mobilization, and demobilization following completion of <br /> sampling. <br /> • Sediment sample collection in accordance with the DNR Easement. <br /> • Coordination with the City regarding sampling results. <br /> • Data processing and loading of data to Floyd I Snider's chemical database <br /> o Includes Tier 1 (summary) data validation of all chemical results except <br /> dioxins/furans <br /> o Includes Tier 3 (full) data validation of dioxin/furan results <br /> • Preparation of a draft Sediment Sampling and Analysis Report for City review and <br /> comment. <br /> • Preparation of a final Sediment Sampling and Analysis Report for submittal to DNR <br /> and Ecology. <br /> C:\Users\megank\AppData\Local\Microsoft\Windows\Temp Scope of Work Amendment <br /> orary Internet Files\Content.Outlook\WHF19RS0\FS SOW <br /> Amendment4 ms 052217.docx <br /> Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.