Laserfiche WebLink
Project: Citywide Intersection Signing <br /> Change Order No. 1 <br /> Change Order Effective Date: March 17. 2017 <br /> 4. The duration of the Contract shall be adjusted to the extent described in this Change <br /> Order. <br /> 5. Contractor waives and releases any and all claims arising out of, or related to, this <br /> Change Order, the work described in Exhibit A, and all work and actual or constructive <br /> changes that occurred or began prior to the date of this Change Order, including, but <br /> not limited to, claims for equitable adjustment of time and compensation, delay, impact, <br /> overhead, or inefficiencies. This provision does not apply to requests for equitable <br /> adjustment of time or price for which the Contractor timely and properly provided <br /> notice of a differing site condition, protest, dispute, claim or Contract Claim as required <br /> by the Contract Documents. If the Contract Documents establish a time period for <br /> notice of a differing site condition, protest, 'dispute, claim, or Contract Claim that ends <br /> after the date of this Change Order, but relates to work performed prior to the date of <br /> this Change Order,then this provision does not apply if the Contractor timely and <br /> properly submits such notice <br /> 6. This Change Order only changes the contract between Contractor and City to the <br /> extent explicitly provided herein. <br /> CITY <br /> Attest: Approved As to Form: <br /> it1100 <br /> 4......, A lit \ <br /> M.� Cit Cler <br /> . 4( �� y City Attorpey <br /> Da <br /> ' Date: <br /> Date: W 3//-- -- <br /> Recommended By: <br /> Construction Project Engineer (if Engineering Department Director <br /> Manager(if applicable) Manager(if <br /> applicable) applicable) <br /> le Ili0 <br /> Date: Date: 1 'I� . <br /> te: 3-2q—(7 Date' � �'�" <br /> 1 --rr 1 <br /> CONTRACTOR <br /> By Date: <br /> 3_ ^1 <br /> Officer <br /> Page 2 of 3 <br />