My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
A-1 Landscaping & Construction, Inc. 6/22/2017 Change Order 1
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
A-1 Landscaping & Construction, Inc. 6/22/2017 Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2017 10:01:14 AM
Creation date
6/23/2017 10:01:12 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
A-1 Landscaping & Construction, Inc.
Approval Date
6/22/2017
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
Riverfront Development North Wetland Complex
Public Works WO Number
RD3312
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0000177
Total Compensation
$55,850.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
A-1 Landscaping and Construction, Inc. 7/20/2016
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> Project: Riverfront Development North Wetland Complex <br /> Change Order No. I <br /> Change Order Effective Date: 5/22/2107 <br /> Contractor and City agree as follows: <br /> 1. The scope of Work shall be changed to the extent described in Exhibit A. <br /> 2. With the exception of Washington State sales tax, the amount of the change order for <br /> the changes described in Exhibit A, represents complete compensation for the changes <br /> described in Exhibit A, including all direct and indirect costs and impacts. The contract <br /> price shall be adjusted as described in this Change Order. <br /> 3. Everett Municipal Code 3.80.050 sets forth the threshold amounts below which the <br /> Mayor or his designee is authorized to direct Contractor to perform additional work. In <br /> calculating such threshold amounts,Washington State sales tax, if applicable to the <br /> Work, has been considered. <br /> 4. The duration of the Contract shall be adjusted to the extent described in this Change <br /> Order. <br /> 5. Contractor waives and releases any and all claims arising out of,or related to, this <br /> Change Order,the work described in Exhibit A, and all work and actual or constructive <br /> changes that occurred or began prior to the date of this Change Order, including, but <br /> not limited to, claims for equitable adjustment of time and compensation, delay, impact, <br /> overhead, or inefficiencies. This provision does not apply to requests for equitable <br /> adjustment of time or price for which the Contractor timely and properly provided <br /> notice of a differing site condition, protest, dispute, claim or Contract Claim as required <br /> by the Contract Documents. If the Contract Documents establish a time period for <br /> notice of a differing site condition, protest, dispute,claim, or Contract Claim that ends <br /> after the date of this Change Order, but relates to work performed prior to the date of <br /> this Change Order, then this provision does not apply if the Contractor timely and <br /> properly submits such notice <br /> 6. This Change Order only changes the contract between Contractor and City to the <br /> extent explicitly provided herein. <br /> CITY <br /> Attest: Approved As to Form: <br /> (31.-16 <br /> Ma City C1 rk City Attorne <br /> Date: uller4- Date: d- de/ /V/ <br /> Recommended By: <br /> Construction Project Engineer (if Engineering Department Director <br /> Manager(if applicable) Manager(if <br /> applicable) applicable) <br /> • 140 <br /> >t�L I. A _l (/ <br /> Date: j, /� Date: fEl te: -12-17 Dat <br /> Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.