Laserfiche WebLink
PLANNING COMMISSION REPORT TO CITY COUNCIL <br /> SHORELINE MANAGEMENT PERMIT 11-89 <br /> Langus Riverfront Park Fill <br /> March 7, 1989 <br /> WHEREAS, the City of Everett has received an application as follows: <br /> Applicant: City of Everett <br /> Parks & Recreation <br /> 3002 Wetmore Avenue <br /> Everett, WA 98201 <br /> Representative: Daryl Bertholet <br /> Parks Department <br /> Phone: 259-0300 <br /> Project Coordinator: Pearl Maddy <br /> Everett Planning Department <br /> Phone: 259-8731 <br /> Requested Action: Shoreline Permit per City Ordinance <br /> 723-80 as amended. <br /> Project Location: Langus Riverfront Park on <br /> Smith Island, west of I-5 south of <br /> Dagmar•s Landing. <br /> Project Description: To move 85,000 to 130,000 cubic yards <br /> of river dredge sand currently being <br /> used to surcharge the Sewage Treatment <br /> Plant construction site on Smith <br /> Island. The majority of the material <br /> will be stockpiled on the DNR Dredge <br /> Disposal site adjacent to Langus Park . <br /> with the remainder to be stockpiled on <br /> future park building construction sites <br /> to be constructed as part of Phase II <br /> of Langus Riverfront Park.. <br /> Existing Shoreline Designation: Urban. (The controlling Shoreline Plan <br /> is the Snohomish County Shoreline <br /> Master Program as the City of Everett <br /> has not amended its Shoreline Program <br /> to include annexed properties.) <br /> Exhibits: <br /> 1. Vicinity/Zoning Map <br /> 2. Flood Plain Zoning: Everett Municipal Code Section 19.11.050 <br /> 3. Federal Regulations Title 24 (CFR) Sec. 60.3 (Flood Insurance Program) <br /> 4. Snohomish County Shoreline Master Program Excerpts <br /> a. Urban Environment <br /> b. Landfill and solid waste disposal <br /> c. Recreation <br /> 5. Determination on Non-Significance <br /> 6. Site Plan <br /> 7. Flood Insurance Map <br />