Laserfiche WebLink
. - <br /> 13. Construction or substantial progress toward construction of the <br /> project must be undertaken within two years after final approval of <br /> the permit and completed within five years. If the project has not <br /> been completed in this time span, the permit will be reviewed by the <br /> Planning Department which will either extend the permit for a period <br /> of one year or terminate the permit. <br /> Approved: March 7, 1989 1/#1 <br /> / <br /> f <br /> Gretchen Shaffer, Chai man <br /> Everett Planning Commission <br /> VOTE: <br /> FOR: 5 (Duffy, Moser, Shaffer, Staudt, Pinkham) <br /> AGAINST: 0 <br /> ABSENT: 2 (Douthitt, Berg) <br /> ABSTAIN: 0 <br /> 0381S <br /> The following Condition No. 14 was added by City Council action on March 22, 198' , <br /> to respond to concerns expressed by the Department of Ecology in a letter to the <br /> City received March 8, 1989. <br /> 14. A protective buffer a minimum of twenty-five feet in width as shown on the <br /> site plan and cross sections submitted to the City Council on March 22, <br /> 1989, shall be maintained between the ordinary high water mark of the <br /> river and wetlands and any fill placed on the sites to protect riparian <br /> vegetation and prevent destabilizing the bank soils. <br /> t � <br /> Date: March 22, 1989 eemzee <br /> Connie Niva, City Council President <br /> -6- <br />