My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2702 COLBY AVE PEOPLES BANK 2021-04-20
>
Address Records
>
COLBY AVE
>
2702
>
PEOPLES BANK
>
2702 COLBY AVE PEOPLES BANK 2021-04-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2021 3:52:29 PM
Creation date
6/28/2017 9:21:53 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
2702
Tenant Name
PEOPLES BANK
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� Date: 2/5/2016 <br /> PUBLIC �YORKS PERMIT Public Works Permit#: PW1602-015 <br /> City of Everett Public Works Department <br /> ���� 3200 Cedar Street Parent Permit#: PW1505-037 <br /> Everett, WA 98201 Planning Reference#: <br /> (425) 257-8810 <br /> Public Works Fee $: $ 25.00 <br /> Other $: <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> PEOPLES E3ANK GAFFNEY CONSTRUCTION <br /> 3100 WOBURN ST <br /> BELLINGHf�M Wq gg22g <br /> PHONE: PHONE: 4253397624 <br /> TAX PARCEi�ID# 00439162403000 SITE ADDRESS: 2702 COLBY AVE <br /> ALLEY CLUSURE ON THE WEST SIDE OF PEOPLES BANK <br /> THIS CLOSURE IS IN CONJUNCTION WITH THE REMODEL/CONSTRUCTION WORK AT THE PEOPLES BANK. <br /> PERMIT CONDITIONS <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work sh�ill be performed in accordance with the permit and current City of Everett Design and Construction Standards <br /> and Specific;ations. <br /> 3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 <br /> _ - ;:°iU� <br /> _; ,: <br /> 4. A Symbolic'NO LEFT TURN° (MUTCD# R3-2)sign must be placed along Everett - <br /> ._ <br /> Ave at the alle��to advise westbound drivers that the turn into the alley is closed. ,.� �: w <br /> '; . _. �-.._ � <br /> 5. A Symbolic"NO RIGHT TURN" (R3-1) sign must be placed along Everett Ave at the '"' - _ ._.; � <br /> alley to advise �astbound drivers that the turn into the alley is closed. <br /> 6. "ROAD CLOSED" (R11-2) signs must be placed at the north and south ends of the � '� � <br /> i,,i;� ;....,. O <br /> alley closure area. ;�:� ; � <br /> i:�'1 <br /> 7. A"ROAD CL.OSED AHEAD" (W20-3) sign must be placed at the south end of the �"� " �'�a � Z <br /> alley, just north of California St, to advise northbound drivers entering the alley that the ��a �, ,_,� O <br /> alley is closed in this block. <br /> , � <br /> Public Works F'ermit Fee Breakdown: � <br /> Misc. Minor Permits$25.00 O <br /> � <br /> ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save harmless the <br /> j; � / � � City of Everett from any and all claims for damages,costs,expenses,or <br /> ` � ;�L :��GC L'-f��2✓ L- S_ �(�, causes of action that may arise because of installation and maintenance of the <br /> improvement or other right-of-way use hereto applied for and further agrees to <br /> A roved for Construction Date remove same upon notice from the City and to replace public property <br /> damaged thereby. I <br /> i) �'--�, ,'� <br /> �.:- % .� — �' �n <br /> FINAL INSPE:CTION Date ,, � <br /> Approved as Constructed Signature of Applicant ,� - Date <br /> , `�/ i <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND 7Y-IER�AFfiER IS TO BE DILIGENTLY <br /> PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.