My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2702 COLBY AVE PEOPLES BANK 2021-04-20
>
Address Records
>
COLBY AVE
>
2702
>
PEOPLES BANK
>
2702 COLBY AVE PEOPLES BANK 2021-04-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2021 3:52:29 PM
Creation date
6/28/2017 9:21:53 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
2702
Tenant Name
PEOPLES BANK
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> 2012 Washington State En -� Code Compliance Forms for Commercial, Gr R1, and > 3 story R2 and R3 <br /> 2012 Washin ton State Ener Code Compliance Forms for Commercial, Grou R1,and>3 sto R2 and R3 Revised June 2013 <br /> Project Info ProjectAddress People�s Bank Date 5/22/2015 <br /> 2�02 Colby Avenue For Building Dept. Use <br /> Everett, WA 98201 <br /> Applicant Name: xzcE czoup, znc. N l <br /> Applicant Address: 2ozoi Cedar Valley 1td, Suite 120 'r`� `-'J �``� � <br /> Applicant Phone: a2s-��a-saz9 �� L" <br /> Project Description New construction, HVAC design for 2nd floor office space utilizing 2- package Gas/AC <br /> Briefly describe mechanical units located on roof with ducting,GRDs and controls also two restroom exhsaust fans. <br /> system type and features. 1st Floor shell and core with two Gas furnaces with cooling coils with condensing units <br /> located on roof to serve future TI. All systems to have 100%air economizers. <br /> ❑✓ Includes Plans Drawings must contain notes requiring compliance with commissioning provisions per Section C408 <br /> �Simple System Q Complex System �Systems Analysis <br /> Compliance Option <br /> E Ul ment Schedules The following information is required to be incorporated with the mechanical equipment schedules on <br /> q P the plans. For projects without plans,fill in the required information below. <br /> Coolin E ui ment Schedule <br /> Equip. Equip Capacity2 OSA CFM SEER Econmizer Heat <br /> ID Type Brand Name' Model No.' Btu/h or Econo? or EER IPLV3 Option or Recovery <br /> Exceptionfi Y/N <br /> See schedules <br /> sheet M1.1 <br /> Heatin E ui ment Schedule <br /> Equip. Equip Capacity2 OSA cfm Heat <br /> ID Type Brand Name' Model No.' Btu/h or Econo? Input Btuh Output Btuh Efficiency4 Recovery <br /> Y/N <br /> See schedules <br /> sheet M1.1 <br /> Fan E ui ment Schedule <br /> Equip. Equip <br /> ID Type Brand Name' Model No.� CFM gp' HP/BHP Flow Controls Location of Service <br /> See schedule <br /> sheet M1.1 <br /> Service Water Heating Equipment Schedule <br /> Equip. Equip Input Sub- <br /> ID Type Brand Name' Model No.' Capacity Category EF' Location of Service <br /> See schedule <br /> sheet M1.1 <br /> 'If available. z As tested according to Table C4032.3(1)A thru C403.2.3(8). 3 If required. °COP, HSPF,Combustion Efficiency,or AFUE,as <br /> applicable. 5 Flow control types:variable air volume(VAV),constant volume(CV),or variable speed(VS). 6 Economizer exception number per <br /> f/ �1 , <br /> \, <br />
The URL can be used to link to this page
Your browser does not support the video tag.