Laserfiche WebLink
� <br /> 2012 Washington State En -� Code Compliance Forms for Commercial, Gr R1, and > 3 story R2 and R3 <br /> 2012 Washin ton State Ener Code Compliance Forms for Commercial, Grou R1,and>3 sto R2 and R3 Revised June 2013 <br /> Project Info ProjectAddress People�s Bank Date 5/22/2015 <br /> 2�02 Colby Avenue For Building Dept. Use <br /> Everett, WA 98201 <br /> Applicant Name: xzcE czoup, znc. N l <br /> Applicant Address: 2ozoi Cedar Valley 1td, Suite 120 'r`� `-'J �``� � <br /> Applicant Phone: a2s-��a-saz9 �� L" <br /> Project Description New construction, HVAC design for 2nd floor office space utilizing 2- package Gas/AC <br /> Briefly describe mechanical units located on roof with ducting,GRDs and controls also two restroom exhsaust fans. <br /> system type and features. 1st Floor shell and core with two Gas furnaces with cooling coils with condensing units <br /> located on roof to serve future TI. All systems to have 100%air economizers. <br /> ❑✓ Includes Plans Drawings must contain notes requiring compliance with commissioning provisions per Section C408 <br /> �Simple System Q Complex System �Systems Analysis <br /> Compliance Option <br /> E Ul ment Schedules The following information is required to be incorporated with the mechanical equipment schedules on <br /> q P the plans. For projects without plans,fill in the required information below. <br /> Coolin E ui ment Schedule <br /> Equip. Equip Capacity2 OSA CFM SEER Econmizer Heat <br /> ID Type Brand Name' Model No.' Btu/h or Econo? or EER IPLV3 Option or Recovery <br /> Exceptionfi Y/N <br /> See schedules <br /> sheet M1.1 <br /> Heatin E ui ment Schedule <br /> Equip. Equip Capacity2 OSA cfm Heat <br /> ID Type Brand Name' Model No.' Btu/h or Econo? Input Btuh Output Btuh Efficiency4 Recovery <br /> Y/N <br /> See schedules <br /> sheet M1.1 <br /> Fan E ui ment Schedule <br /> Equip. Equip <br /> ID Type Brand Name' Model No.� CFM gp' HP/BHP Flow Controls Location of Service <br /> See schedule <br /> sheet M1.1 <br /> Service Water Heating Equipment Schedule <br /> Equip. Equip Input Sub- <br /> ID Type Brand Name' Model No.' Capacity Category EF' Location of Service <br /> See schedule <br /> sheet M1.1 <br /> 'If available. z As tested according to Table C4032.3(1)A thru C403.2.3(8). 3 If required. °COP, HSPF,Combustion Efficiency,or AFUE,as <br /> applicable. 5 Flow control types:variable air volume(VAV),constant volume(CV),or variable speed(VS). 6 Economizer exception number per <br /> f/ �1 , <br /> \, <br />