Laserfiche WebLink
PROJECT DESCRIPTION <br /> The site is located in the Everett Mall, in Everett, Washington. The site is part of existing parking area <br /> for the entire mall. As existing almost the entire site is impervious,with asphalt taking up the majority <br /> of the existing site for this location. <br /> The proposed construction will consist of a 7,660 square foot, single-story restaurant, there is an <br /> additional 236 square feet of roof that covers the trash enclosure area. A portion of the existing parking <br /> lot will remain as designed previously,with the modifications being made only to adhere to current ADA <br /> standards. <br /> SITE ASSESSMENT <br /> The site slopes gradually to the south. <br /> The current method of collecting storm water in our area of the project is overland to catch basins to <br /> the south of the project. <br /> SITE DEVELOPMENT PLAN <br /> The project is designed to collect the roof drainage and splash block it onto the new landscape that is <br /> designed adjacent to the building runoff. The existing parking lot that will remain will continue to drain <br /> as it currently does. <br /> Within the project area,a portion of the existing asphalt will be converted into landscape, because of <br /> this the actual runoff from the area will be reduced post the new construction. The projected decrease <br /> is due to the fact that the proposed project incorporates a lot more landscaping than the existing <br /> project. <br /> CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN <br /> A construction SWPPP has been prepared for this project <br /> SOURCE CONTROL PLAN <br /> A source control plan is part of the erosion control plan that is a part of the construction documents. <br /> aS (j( <br />