Laserfiche WebLink
SPECIAL REPORTS AND/OR STUDIES AND OTHER PERMITS <br /> No other permits,except for building permits are required for this project. <br /> CONCLUSION <br /> The proposed Olive Garden project meets City drainage criteria by in fact reducing the amount of runoff <br /> from the project. The Pre-project condition has a runoff of 1.15 cfs,and the post project condition has a <br /> runoff of 0.99 cfs for a 14%reduction in runoff(see attached calculations). The project's impact on the <br /> existing storm drainage system is extremely insignificant and actually reduces the amount of runoff. <br /> 1 <br />