Laserfiche WebLink
tests, witnessed by a Fire Department Inspector, shall be performed, along with a certificate of <br />completion, prior to final acceptance of the system. <br />Fire alarm systems shall be installed according to NFPA Chapter 72, 2010 Edition. Installation of <br />fire alarm components, including basic wiring, may not commence before plans are approved <br />by the Fire Department Plan Reviewer. Fire alarm drawings must be professionally rendered, in <br />sufficient detail, and must be internally consistent. Riser diagrams must match installation plans and <br />load calculations. Components must be listed and approved for use together. Changes to plans must <br />include new drawings and calculations and must be approved by the Fire Department Plan Reviewer <br />prior to installation. Fire alarm installation is subject to field inspection by a Fire Department <br />Inspector. An approved set of plans and the Engineering & Public Services Department electrical <br />permit must be present for any installation inspection. <br />Fire alarm systems shall be installed under permit of the City of Everett Engineering & Public <br />Services Department. Electrical inspections and approval are required prior to calling for acceptance <br />tests. Call (425) 257-8810 for permit information. <br />The absence of monitoring for the alarm system will be cause for postponing Fire Department <br />inspection and testing and shall result in denial of occupancy. <br />A copy of NFPA 72 Record of Completion form must be filled out prior to final occupancy (NFPA <br />72, 2010 Edition, Chapter 10, page 114). <br />Call for design requirements per Authority Having Jurisdiction. <br />Automatic smoke detection is required. <br />11. All fire alarm control panels (FACP) and sprinkler valves shall be in heated rooms or closets with <br />standard man door access. Locations shall be approved by the Fire Code Official (NFPA 13 <br />8.16.4.1.3). <br />12. Trash Collection - Dumpsters over 1.5 cubic yards capacity shall be located a minimum of 5 feet <br />from the building (IFC 304.3.3 and 304.3.4, 2012 Edition). <br />13. A building footprint and lot layout for this project shall be provided to the Fire Marshal's Office on <br />CD/DVD. <br />Snohomish Heath District Comments — Elaine Hagedorn, R.S. — 425.339.8742 <br />A plan review application and operating permit application is required from the Snohomish Health <br />District. <br />Snohomish County PUD Comments — Mark A Oens — 425.783.4300 <br />The District presently has sufficient electrical system capacity to serve the proposed development. <br />However, the existing District facilities in the local area may require upgrading. Any relocation or <br />removal of District facilities to accommodate this project shall be at the expense of the project <br />developer. Cost of any work, new or upgrade, to existing District facilities shall be at the expense of <br />the project developer and shall be in accordance wi he applicable District policy. The developer <br />714) <br />Final MDN 16-005 <br />