Laserfiche WebLink
FEB 6 1987 <br /> CITY OF. i ,:1;I'T , <br /> Planning L)ept. <br /> 2701 Wetmore <br /> P.O. Box 1003 <br /> Everett, Washington 98206 <br /> February 3, 1987 <br /> Mr . Gerry Ervine <br /> City of Everett <br /> City Hall <br /> 3002 Wetmore <br /> Everett, Washington 98201 <br /> Dear Mr. Ervine: <br /> RE: SEPA # 118-86 <br /> GTE Northwest does not anticipate any problem relative to the <br /> placement of fill material on the 66 acre site, located west of <br /> Highway #99 North, south of Union Slough (Smith Island) . <br /> However, as future development may occur throughout this area, <br /> GTE Northwest requests that all utility easements be retained for <br /> facility access. <br /> If additional information is needed, please contact John Moe, <br /> Project Engineer at 339-2053. <br /> Sincerely, <br /> 11,416/14 <br /> 411kIL-- <br /> Will Hel on <br /> Engineering Supervisor-North <br /> E; , , , <br />