Laserfiche WebLink
li <br /> 22. The site plan shows a subdivision of the property but the subdivision <br /> is not proposed in this review. The City must approve any <br /> segregation of property through a subdivision/binding site plan <br /> process. <br /> 23. A Hydraulic Project Approval issued by Washington State Department of <br /> Fisheries is required prior to any construction activity below the <br /> ordinary high water mark in surface waters of the state. (RCW <br /> 75.20.110) This would include, but not be limited to, any dredging, <br /> dock construction or outfall placement related to this project . <br /> 24. The applicant shall contact the Washington State Department of Game <br /> once the full extent of eagle use on the site is known and the Game <br /> Department will assist in an eagle management plan as required under <br /> State Bald Eagle Management Rules (RCW 77. 12.655) • <br /> 25. The applicant shall obtain all necessary permits from the Snohomish <br /> County Health District for the placement of construction rubble on <br /> site. <br /> 26. All industry locating within 200 feet of the shoreline on the subject <br /> property must be water dependent. <br /> 27. That filling or substantial progress toward filling of the subject <br /> property must be undertaken within two years after final approval of <br /> the permit, and completed within five years. If the project has not <br /> been completed in this time span, the permit will be reviewed by the <br /> Planning Department who will do one of the following. <br /> - extend the permit for one year, or <br /> - terminate the permit <br /> DATE: March 18, 1987 ji?- • <br /> Ly✓ L C r <br /> Ore chen Shaffer <br /> City of Everett Planning <br /> Commission, Chairperson <br /> VOTE: FOR: 5 (Moser, Utt, Buchea, Shaffer, Staudt, <br /> Duffy) <br /> AGAINST: 1 (Moser) <br /> ABSENT: 1 (Hoagland) <br /> ABSTAIN: 0 <br /> DATE: March 25, 1987 <br /> Carl Gipson <br /> City Council President <br /> 3750F <br /> -6- <br />