My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2102 OAKES AVE 2017-07-28
>
Address Records
>
OAKES AVE
>
2102
>
2102 OAKES AVE 2017-07-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2017 9:38:08 AM
Creation date
7/13/2017 1:37:11 PM
Metadata
Fields
Template:
Address Document
Street Name
OAKES AVE
Street Number
2102
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Residential Photovoltaic OTC Permit Application <br /> u � f <br /> Contractors can apply for an Over-The-Counter(OTC)permlt where the PV system meets the requirements listed <br /> in this Checkllst.All protect plans and supporting documentation must be provided on site for the Inspector. <br /> --- ----f® BE COMPLETED BY APPLICANT--.---- <br /> ® Project Information <br /> Property Owner Name: Paul Bernhard <br /> Project Address: 2102 Oakes Ave. Parcel# <br /> City: Everett State: WA ZIP: 98201 <br /> Day Phone: 206-459-1739 <br /> Contractor Name Sunergy Systems, Inc. <br /> Contractor License#: sunersi905d4 <br /> .Contractor Day Phone: 206-297-0086 <br /> PVsysterndescription ROOF MOUNTED PHOTOVOLTAIC, GRID TIED SYSTEM, NO BATTERIES <br /> (include manufacturer ALL LISTED EQUIPMENT, RAPID SHUTDOWN COMPLIANT. <br /> and model#of PV <br /> modules and <br /> Inverters): <br /> )Determine if VOLIV Project qualifies fol•eupedited permitting: <br /> Yes No <br /> 1, PV system Is designed and proposed for a detached one-or two-family dwelling or <br /> townhouse not more than three stories above grade or detached accessory structure that ❑ <br /> is code compliant to setbacks and height,or code allows expansion of nonconformity for <br /> solar modules. [IRC 101.21 <br /> 2. Modules on pitched roofs do not exceed the highest point of the roof unless approved by ❑ <br /> the local jurisdiction. <br /> 3. Rooftop is made from lightweight material such'as a single layer of composition shingles, ❑ <br /> meta I roofing,lightweight masonry,or cedar shingles. El <br /> 4. The Installation shall comply with the manufacturer's Instructions.[IRC M2302,21 <br /> S. The Installation shall meet the requirements of NFPA 70 National Electric Code,and all <br /> required electrical permlt(s)must be obtained from the Authority Having Jurisdiction to ❑ <br /> administer the electrical code.(IRC M2302.2] <br /> G. The Installation shall meet the requirements of the International Fire Code as amended ❑ <br /> by WA State.[IRC M2302.2] <br /> 7. The PV system is designed for the wind speed of the local area,and will be Installed per C7 <br /> the manufacturer's specifications, [IRC M2302,2.1(1)) <br /> 8. The ground snow load does not exceed 70 pounds per square foot,[IRC M2302,2.1(2)] ❑ <br /> 9. Total dead load of modules,supports,mountings,raceways and all other appurtenances <br /> weigh no more than-four pounds per-square foot.[IRC M2302,2,1(3)] O <br /> Enter total dead load of system(lbs/ftz): 3 <br /> 10, To address uplift,modules are mounted no higher than 18"above the surface of the ❑ <br /> roofing to which they are affixed, [IRC M2302,2.1(4)] <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.