My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2102 OAKES AVE 2017-07-28
>
Address Records
>
OAKES AVE
>
2102
>
2102 OAKES AVE 2017-07-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2017 9:38:08 AM
Creation date
7/13/2017 1:37:11 PM
Metadata
Fields
Template:
Address Document
Street Name
OAKES AVE
Street Number
2102
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0100 amp bus/100 amp main OCPD- 3,840 AC watts,maximum 20 amp Inverter OCPD, <br /> ❑Other-Electrical Permit with Plan Review Required <br /> Note 1:listed un-altered factorymain/bus combination.Alteration of the ponelboard main 0CP0 tvlil require plan review. <br /> Note 2.The circuit conductors and overcurrent devices shell be sized to carry notless than 125 percent of the maximum currents <br /> ds calculated In 690.8(A).The rating or setting of overcurrent devices shall be permitted In accordance with 240AfB)and(C).NEC <br /> 690.8fB)(1) <br /> Note 3.if a panelboard employs a snap switch rated 30 amperes or less In any branch circuit,It cannot be rated more than 200 <br /> amperes unless there is a supplyside overcurrent protection at 200 amperes orless within the ponelboard.This requirement does <br /> not apply to ponelboords equipped with circuit breakers.Section 408.36(A)of the NEC. <br /> 7. 1 have attached the following Electrical One-Line Diagram: <br /> []Standard Electrical Diagram-6 Strings or Less <br /> tandard Electrical Diagram-4 Strings or Less <br /> standard Electrical Diagram-Micro Inverter <br /> El None of the above-Electrical Permit with Plan Review Required <br /> Comments: <br /> F. If you answered yes to all of the above questions,your project qualifies for over the Over-the- <br /> Counter electrical permit. <br /> 5 <br /> I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws <br /> and ordinances governing this type of work will be completed whether specified herein or not. The granting of a permit does <br /> not presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the <br /> performance of construction. That I am authorized by the owner of this property to perform the work for which application Is <br /> made and I comply with the State Contractors Law 18.27 RCW and 296.200 WAC. <br /> E <br /> t Signature: C` rDate: y ////4t Name(Please Print}: <br /> ---------TO BE COMPLETED BY CITY STAFF------ <br /> Sta flfie it in Permit? Yes []No Permit cftlon_ #: <br /> Staff o2A <br /> t iais Date: („��l� � l��/ \���I(�ji''1. <br /> mit#: <br /> Qualifies for ctrica TC? es El No <br /> Per <br /> Staff initials Date: `�`� <br />
The URL can be used to link to this page
Your browser does not support the video tag.