Laserfiche WebLink
Z � <br /> 24 SPR-X22-360-WHT-AC Module 8.64kW PV Array- 7680W AC Max Output NOTES: <br /> 2 branch circuits @ 12 ACmodules: 1.ALL AC PV MODULES SHALL BE CONNECTED WITH MANUFACTURER SUPPLIED CONNECTORS. <br /> 2. INVERTER BRANCH CIRCUIT TRANSITION BOX SHALL BE LOCATED ON THE ROOF AND NEMA 3R <br /> RATED. <br /> SPR X-21-360-ACPV SPR X-21-360-ACPV 3.ALL WIRES FROM ROOF TRANSITION BOX TO AC COMBINER PANEL SHALL BE 10AWG.THHN AND IN <br /> AC Modules AC Modules CONDUIT TO MEET NEC CODE AND LIMIT VOLTAGE DROP TO LESS THAN 2%. <br /> 240AC/1.3ac max 4.WIRING IN DC CIRCUITS TO BE RATED 600V-90C, EXPOSED CABLES SUNLIGHT RESISTANT. <br /> 240AC/1.3 max 5. PV SYSTEM Voc SHALL NEVER EXCEED 600 VDC. <br /> outputt Output MARKING/LABELING 6. PRODUCTION METER PV SYSTEM DISCONNECT SHALL BE LOCATED NEXT TO NET-METER. <br /> 7. PV MODULE, MICRO-INVERTER AND RACKING CONTINUOUS GROUNDING CONDUCTOR TO <br /> • . PER NEC 690 GROUNDING ELECTRODE SHALL BE 6AWG BARE WIRE. <br /> AC 'a` AC <br /> ;" i Module 1 I� r i Module 1 SYSTEM INCLUDES RAPID SHUTDOWN AND REQUIRED LABELING. <br /> RAPID SHUTDOWN IS INITIATED BY LOSS OF UTILITY POWER. � <br /> i I SOLAR kWh METER FOR C�'J <br /> See <br /> I See I ; PRODUCTION <br /> ; INCENTIVES r, 1 <br /> detail detail Location: NEXT TO 120/240 VAC 1)7� rU/ APR r <br /> at right at right 200 amp FROM UTILITY <br /> NET METER 2 <br /> service SPR-360-X22-ACPV MODULE fly® 01/ <br /> / I / 2 M peri F <br /> I • L1l N �/t Se,t'ices <br /> s :;:�; :`'''''' ' I L1 L2 Meter #. Module DC <br /> ti, <br /> input <br /> P <br /> ' r n• ' <br /> 0: NEMA 3R- #8, THWN-2 copper <br /> ` f Locking 240 VAC 1,6 60HZ, I DC <br /> I Disconnect 32AAC(max) <br /> Visible- 7680Wmp - <br /> Break AC <br /> Location: <br /> I I NEXT TO 200amp <br /> NET M LOAD <br /> t METER \ C:� CENTER I L1 N L2 G <br /> ' b <br /> Inverter AC output: <br /> #8 320watts, 240vac/1.33A <br /> THWN-2 <br /> copper I <br /> 1. , . .., <br /> ;:'•.f <br /> Internet via <br /> ' Module 1 i Module <br /> L 0 HomePlug and <br /> 1 12 1 1 12 -�. %------ 0 open space in <br /> 1 1 customer router <br /> Li -- - i <br /> 1 11 20A <br /> 16awg <br /> _ monitor CONTINUOUS <br /> L. G 20A SUPER EQUIPMENT Utility District: PROPERTY OFSunergy . <br /> VISOR GROUND SnoPUD Systems L It NERGYsYsTEms- <br /> 4546 Leary <br /> NEMA 100amp ac Jurisdiction: Customer: Bernhard Seattle,WA 8107 <br /> 3R roof Combiner panel: Everett Project: <br /> junction Location: NEXT TO Drawn By: 8.64kW SunPower-ACPV Photovoltaics stem <br /> box NET METER Jon Lange,NABCEP Site address: Title/Part/Descrition: <br /> Electrical Engineer: 2102 Oakes Ave <br /> Howard Lamb,MSEE PV ELECTRICAL <br /> Date: 4/6/17 Everett,WA 98201 CONFIGURATION DRAWING <br /> Signatures: <br /> Engineer: <br />