My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000 TOWER ST OLYMPUS HALL 2017-07-28
>
Address Records
>
TOWER ST
>
2000
>
OLYMPUS HALL
>
2000 TOWER ST OLYMPUS HALL 2017-07-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2017 11:48:31 AM
Creation date
7/17/2017 9:40:11 AM
Metadata
Fields
Template:
Address Document
Street Name
TOWER ST
Street Number
2000
Tenant Name
OLYMPUS HALL
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2012 Washington State Energy Code Compliance Forms for Commercial,Group R1,and>3 story R2 and R3 Revised June 2013 <br /> Project Address 801 Wetmore Ave-EvCC Olympus Hall HVAC Date 1/25/2016 <br /> The following information is necessary to check a mechanical permit application for commercial provision compliance with the 2012 <br /> WSEC. NOTE:Define print area in Excel prior to printing MECH-CHK pages. <br /> ApplicabilityCode Section Code Provision Information Required Location Building Department <br /> (yes,no,na) I I on Plans Notes <br /> GENERAL PROVISIONS,CONTINUED <br /> HVAC System Controls&Criteria,Continued <br /> Y C403.2.12 Variable flow control- Indicate fan&pump motors requiring VF control&method(VSD or equiv M0.2 <br /> fans/pumps controls <br /> NA C403.2.12.1 Variable flow control- Indicate cooling tower fans requiring variable flow control and method _ <br /> cooling towers <br /> NA C403.2.12.2 Large volume fan systems Indicate fan systems requiring airflow reduction based on heating and <br /> cooling demand;or exception taken <br /> C403.2.12.2 Single zone AC systems Indicate method of cooling demand-based fan control for sys.>110,000 <br /> NA btuh _ <br /> Y C403.2.4.10 DDC system capabilities ifor Identify all DDC system input/output control points and indicate capability Mo.1 <br /> trendina and demand resoonses <br /> Ducting Systems <br /> C403.2.7.1& Duct construction Indicate all ductwork constructed and sealed per IMC,C402 leakage <br /> Y C403.2.7.3 re uirements and IBC vapor retarder requirements <br /> M0.1 <br /> NA 403.2.7.3.1- Duct pressure Identify location of low,medium and high pressure ductwork on plans _ <br /> classifications <br /> C403.2.7.3.3 High pressure duct leakage Indicate high pressure duct leakage testing requirements on plans;provide <br /> NA test test results to jurisdiction when completed <br /> Y C403.2.7.1/I Duct insulation Indicate R-value of insulation on ductwork M0.1 <br /> Piping Systems <br /> Y C403.2.8 Piping insulation Indicate R-value of insulation on piping Mo.1 <br /> NA C403.2.8.1 Piping insulation exposed to Indicate method of protection from damage/degredation _ <br /> weather <br /> SIMPLE SYSTEMS <br /> Qualifying Systems <br /> NA C403.3 Qualifying single zone Verify unitary or packaged equipment does not exceed capacity limits,does <br /> systems not have active humidification or simultaneous heating/cooling <br /> NA C403.3 Qualifying 2-pipe heating Verify2-pipe heating-only heating-onlysystem does not exceed capacity limits <br /> systems <br /> NA C403.3.2 Hydronic system controls Refer to Complex Systems Section C403.4.3 _ <br /> Simple System Economizers <br /> Y C403.3.1 Air economizer required Indicate cooling systems requiring economizer controls;note in equip M0.2 <br /> sched. <br /> Y C403.3.1.1.1 Air economizer capacity Indicate modulating OSA control capability up to 100%OSA,or exception M0.2 <br /> Y C403.3.1.1.3 Air economizer high limit Indicate high limit shut-off control method per Table C403.3.1.1.3(2) <br /> controls M0.1 <br /> y C403.1.1.2 Integrated air economizer Indicate capability for partial air economizer operation for systems with M0.1 <br /> operation capacity>65,000 btuh <br /> NA C403.3.1 Air economizer exceptions Indicate eligible exception(s)taken and provisions to comply with <br /> io <br /> COMPLEX SYSTEMS <br /> Complex System Economizers <br /> Y C403.4.1 Air economizer required Indicate cooling systems requiring economizer controls;note in equip M0.2 <br /> sched. <br /> C403.4.1.4 Economizer heating system Verify control method of HVAC systems with economizers does not <br /> Y impact increase building heating energy usage during normal operation M0.1 <br /> Y C403.4.1.3 Integrated economizer Indicate capability for partial economizer operation for air or water econo M0.2 <br /> operation systems <br /> Moved Water economizer capacity Indicate water econo capable of 100%cooling capacity at 50°F db145°F wb <br /> N A OSA _ <br /> C403.4.1.2 Water economizer Indicate precooling coils and heat exchangers do not exceed pressure drop <br /> NA maximum pressure drop limit _ <br /> NA C403.3.1 Air economizer exceptions Indicate eligible exception(s)taken and provisions to comply with <br /> lexception(s) <br />
The URL can be used to link to this page
Your browser does not support the video tag.