My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1513 WALNUT ST 2017-07-28
>
Address Records
>
WALNUT ST
>
1513
>
1513 WALNUT ST 2017-07-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2017 3:54:26 PM
Creation date
7/17/2017 1:22:04 PM
Metadata
Fields
Template:
Address Document
Street Name
WALNUT ST
Street Number
1513
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GK BUILDING <br /> STRUCTURAL ENG/NEER/NGS L L C <br /> DEPARTMENT <br /> EFFECTIVE.EFFICIENT.SOLUTIONS <br /> RESPONSE LETTER <br /> City of Everett Public Works January 6, 2015 <br /> Attn: Meg Haley GK Project#: YR6-14-037 <br /> 3200 Cedar Street <br /> Everett, WA 98201 <br /> Re: Corrections Letter#3 Response for 1513 Walnut St <br /> City of Everett Permit#B1409-004 <br /> Dear Ms. Haley: <br /> GK Structural Engineering, LLC(GKSE)is in receipt of the City of Everett Public Works Corrections <br /> Letter#3 dated December 26,2014 for the above referenced project. The following is a <br /> corresponding itemized response and clarification to the plan review comments. Please reference the <br /> attached supplemental drawings. <br /> General: <br /> 1. bJ1Q�b d QP". <br /> a. Thank you for the zeoig clarifications. <br /> b. Reference revised drawing set for the renumbered bedrooms. <br /> 2. Reference revised drawing sheet 1 clarifying a upper floor apartment unit A and main floor <br /> apartment unit B. Gw <br /> 3. Reference revised sheet A 1 which include the applicable Codes for this project. o <br /> 4. Reference revised sheet A I. Qoj\-, Q 0 <br /> 5. Reference revised sheet A I. <br /> 6. Reference revised sheet 1. <br /> Construction: <br /> 1. Reference revised sheet A2. One of the north bedroom#2 (master bedroom)double win s <br /> has been emoved & replaced with a new slider window meetinuireme . The <br /> owner may remove and replace the other set of windows on the north elevations for <br /> consistency. so,the bedroom locate on a sou wa as een recon figure to an o Ice <br /> to a res a egress window issue on the property line. <br /> 2. Reference revised sheet Al. The bedroom located on the south wall has been reconfigured to <br /> an office to address the egress window issue on the property line. Also,the remaining <br /> bedroom#I egress window has been modified to meet code requirements. The bedroom#2 <br /> (master bedroom)has a door to the exterior serving as the means of egress. <br /> 3. Reference revised sheet A2. Notes have been added clarifying that the laundry exhaust fan as <br /> well as the dryer exhaust should be vented thru the roof and not the south exterior wall. <br /> Please call with any questions or clarifications. GIlt <br /> Sincerely, �4tioF 'ti -yam <br /> z d <br /> GK STRUCTURAL ENGINEERING, LLC 4 <br /> Jeffrey J. Gilliland, PE, SE 39 48 <br /> Principal s R4 � ,G <br /> 60B STATE ST S, STE 700-0 PAGE 1 OF 1 P:425.Z3S.9737 <br /> K/RKLANo, WA 9B033 F.425.250.23,94 <br />
The URL can be used to link to this page
Your browser does not support the video tag.