Laserfiche WebLink
(a) Transfer Lots. As used herein, the term"Transfer Lot Group" shall <br /> mean Lot 45-B (approximately 21.49 acres), Lot 45-C (approximately 29.40 acres), and Lot 45- <br /> D (approximately 6 acres) each of which is legally described on Exhibit B attached hereto. <br /> Transfer Lot 3 (approximately 27 acres), is legally described on Exhibit B-1 attached hereto. <br /> Transfer Lot 45-A (approximately 13.12 acres) was properly conveyed to and accepted by the <br /> City on July 11, 2001. As used herein,the "Transfer Lots" shall collectively mean Transfer Lot <br /> 45-A, the Transfer Lot Group, and Transfer Lot 3. Subject to the satisfaction of the applicable <br /> conditions described in this Section 1.2 and in Section 1.8, Owner shall convey to the City by <br /> Statutory Warranty Deed (each, the "Deed"): (i)the Transfer Lot Group on the Transfer Lot <br /> Group Closing Date; and (ii) Transfer Lot 3 on the Transfer Lot 3 Closing Date. Each of the lots <br /> in the Transfer Lot Group and Transfer Lot 3 shall be conveyed together with all of Owner's <br /> rights, title, and interests in and to adjacent streets, alleys, rights-of-way and any strips or gores <br /> of real estate adjoining the Transfer Lot(s) and all improvements, structures and fixtures located <br /> on the Transfer Lot(s) and all rights, title, and interests appurtenant thereto, including all of the <br /> rights, licenses, privileges and easements and rights-of-way, land use entitlements, government <br /> approvals, permits and rights and appurtenances pertaining to or used in connection with the <br /> beneficial use and enjoyment of the Transfer Lot(s) and free and clear of encumbrances or <br /> defects, except the Permitted Exceptions defined in Section 1.7. In addition, the Transfer Lot <br /> Group shall be conveyed"together with" an easement over, under and across the Owner Property <br /> for accessing and using the existing shunt pipes (the "Shunt Pipes") until such time as they are <br /> replaced as part of the construction of the Pigeon Creek No. 2 Facility, as discussed in Section <br /> 1.9 below. <br /> 5 <br />