My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015/10/14 Council Agenda Packet
>
Council Agenda Packets
>
2015
>
2015/10/14 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2015 4:36:50 PM
Creation date
10/16/2015 2:36:27 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
10/14/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
247
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET <br />J <br />PROJECT TITLE: <br />$548,452 <br />C6115(0-14) <br />An Ordinance creating a <br />Briefing <br />COUNCIL BILL4, <br />-0- <br />special improvement project <br />Proposed Action <br />Originating Department <br />Public Works <br />entitled, "Everett Mall Way - <br />Consent <br />Contact Person <br />Ryan Sass <br />4th Ave to East Mall Drive <br />Action <br />Phone Number <br />(425) 257-8942 <br />hatersection Safety," Fund 303, <br />First Reading <br />FOR AGENDA OF <br />October 14, 2015 <br />Program 106, to accumulate all <br />Second Reading <br />costs for the improvement <br />Third Reading- <br />eadingPublic <br />PublicHearing <br />Budget Advisory <br />haitialed by: <br />Department Head <br />CAA <br />Council President <br />h. <br />Location Preceding Action Attachments Department(s) Approval <br />Everett Mall Way, from None <br />Ordinance <br />Public Works <br />e Avenue to East Mall <br />Drive <br />Amount Budgeted <br />$548,452 <br />Expenditure Required <br />$548,452 <br />Account Number(s): PW 3629 <br />Budget Remaining <br />-0- <br />Additional Required <br />-0- <br />DETAILED SUMMARY STATEMENT: <br />This project will develop traffic signal phasing and timing to improve conditions for pedestrians using <br />crosswalks in the Everett Mall Way corridor from 4"' Avenue to East Mall Drive. A Federal Highway Safety <br />Improvement Program (HSIP) grant will provide $498,091 for design and construction of the improvements <br />with local funds providing the balance. <br />The budget for this project is $548,452 and the source of funds are: <br />Federal Grant (HSIP) <br />Fund 119 — Street Improvements <br />Total Funds <br />$ 498,091 <br />50361 <br />$ 548.452 <br />
The URL can be used to link to this page
Your browser does not support the video tag.