My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 2561
>
Resolutions
>
Resolution 2561
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2017 11:55:10 AM
Creation date
7/27/2017 11:55:10 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
2561
Date
4/17/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> 4 <br /> E. 36th Street - Friday Avenue Intersection <br /> Construct concrete curb returns and improve storm drainage at the <br /> northwest corner of the intersection of 36th Street and Friday <br /> Avenue. <br /> F. Grand Avenue - 142nd Street to 43rd Street <br /> Construct curbs, install drainage and enclose open ditches on <br /> west side of the street. Construct new sidewalks on east side of <br /> the street. <br /> II. The Mayor is instructed to have a Plans and Systems ordinance prepared <br /> and presented to the City Council which will officially authorize and <br /> fund the development of contract plans, specifications, and detailed <br /> cost estimates for the improvements listed above. <br /> III. Should costs be less for the above projects than was originally <br /> estimated, projects receiving the next highest priority shall be <br /> initiated. If project costs exceed the estimates given, the lowest <br /> priority project or projects shall be dropped. <br /> i <br /> uncilman I roducing •esolution <br /> Passed and approved this /2 da • Ad.. / , , 1985. <br /> lM - <br /> , 4 ,. 1 _ Aril(tiPillrf6/ <br /> fou c"- .resi•ent <br /> -2- <br /> 0380G <br />
The URL can be used to link to this page
Your browser does not support the video tag.