My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 7/24/2017
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 7/24/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2021 10:13:12 AM
Creation date
7/31/2017 10:42:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
7/24/2017
Council Approval Date
7/5/2017
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Park Bridge
Public Works WO Number
PW3588
Tracking Number
0000801
Total Compensation
$13,789,438.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction 10/23/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc (ICI) 12/2/2019 Change Order 18
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 14
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 15
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 16
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 17
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 1/28/2020 Change Order 19
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 1/28/2020 Change Order 20
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 1/8/2021 Change Order 24
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 10/11/2018 Change Order 5
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 10/19/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 11/13/2018 Change Order 5
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 11/13/2018 Change Order 7
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 11/9/2020 Amendment 25
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 12/4/2018 Change Order 8
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 12/4/2018 Change Order 9
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 12/5/2018 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 3/26/2019 Change Order 10
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 3/26/2019 Change Order 11
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 4/1/2020 Change Order 21
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 4/28/2020 Change Order 22
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 5/1/2019 Change Order 12
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 5/30/2018 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 7/19/2021 Change Order 26
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 7/9/2019 Change Order 13
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Constuction Inc 5/4/2020 Change Order 23
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
/111P 'C'Ll <br /> PUBLIC WORKS <br /> ADDENDUM NO. 2 <br /> GRAND AVENUE PARK BRIDGE <br /> W.O. #3588 <br /> APRIL 27, 2017 <br /> NOTICE TO PLANHOLDERS: <br /> Addendum No. 2 contains the following revisions, additions, deletions and clarifications and is <br /> hereby made a part of the contract documents for the above named Project and shall be <br /> considered by all prospective bidders in submitting bids. <br /> Bidders must acknowledge receipt of Addendum No. 2 in the space provided on page P-14 in <br /> Division P, Proposal Signature Sheet. Failure to comply with this requirement may render the <br /> Bid non-responsive and may cause its rejection. This Addendum consists of 39 pages, including <br /> all revisions, attachments and details. <br /> The Bid date, time, and location for receipt of Bids are unchanged by this Addendum. <br /> 2:00 PM MAY 16, 2017 AT THE CITY CLERK'S OFFICE, 2930 WETMORE AVENUE. <br /> THE CONTRACT DOCUMENTS ARE MODIFIED AS FOLLOWS: <br /> SPECIAL PROVISIONS <br /> 1. Revise: There is no structural carbon steel on the bridge. Special Provisions are to be <br /> revised as follows: <br /> a. On page S144, line 2, delete "Structural Carbon Steel"and replace with <br /> "Structural Low Alloy Steel". <br /> b. On page S150, line 40, delete"structural carbon steel"and replace with <br /> "structural low alloy steel". <br /> c. On page S150, line 41, delete"structural carbon steel"and replace with <br /> "structural low alloy steel". <br /> d. On page S151, line 47, delete"Pedestrian Improvements"and replace with <br /> "Pedestrian Upgrades". <br /> BID PROPOSAL <br /> 2. Replace the Bid Proposal form with the attached replacements for page P3 <br /> through P12. The Bid List has been revised as follows: <br /> a. Bid Item No. A94, the quantity is revised from "5"to"2". <br /> b. Bid Item No. A95 "STRUCTURAL CARBON STEEL— UTUILITY BRIDGE"is <br /> deleted and replaced with "STRUCTURAL LOW ALLOY STEEL — UTILITY <br /> • <br /> BRIDGE". <br /> c. Bid Item No. A97, the quantity is revised from"450"to"360". <br /> d. Bid Item No. A98, the quantity is revised from "36"to"6". <br /> e. Bid Item No. A100, the quantity is revised from"2"to"226". <br /> f. Bid item No. A117, "PSIPE HYPERICUM HIDCOTE (HIDCOTE ST. JOHNSWORT) 2 <br /> GAL POTS" is deleted and replaced with "PSIPE BERBERIS THUNBERGII <br /> 'ATROPURPUREA' (REDLEAF JAPANESE BARBERRY) 36" HT/BB", and the <br /> quantity is revised from"7"to"23". <br /> City of Everett Addendum No. 2 <br /> Project Bid <br /> Grand Avenue Park Bridge Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.