My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 7/24/2017
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 7/24/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2021 10:13:12 AM
Creation date
7/31/2017 10:42:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
7/24/2017
Council Approval Date
7/5/2017
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Park Bridge
Public Works WO Number
PW3588
Tracking Number
0000801
Total Compensation
$13,789,438.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction 10/23/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc (ICI) 12/2/2019 Change Order 18
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 14
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 15
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 16
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 17
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 1/28/2020 Change Order 19
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 1/28/2020 Change Order 20
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 1/8/2021 Change Order 24
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 10/11/2018 Change Order 5
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 10/19/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 11/13/2018 Change Order 5
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 11/13/2018 Change Order 7
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 11/9/2020 Amendment 25
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 12/4/2018 Change Order 8
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 12/4/2018 Change Order 9
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 12/5/2018 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 3/26/2019 Change Order 10
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 3/26/2019 Change Order 11
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 4/1/2020 Change Order 21
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 4/28/2020 Change Order 22
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 5/1/2019 Change Order 12
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 5/30/2018 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 7/19/2021 Change Order 26
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 7/9/2019 Change Order 13
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Constuction Inc 5/4/2020 Change Order 23
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
g. Bid item No. A133, "PSIPE EUONYMUS FORTUNEI 'COLORATUS' (PURPLELEAF <br /> WINTERCREEPER) QT POTS" is deleted and replaced with"PSIPE VIBURNUM <br /> DAVIDII (DAVID VIBURNUM) 5 GAL POTS", and the quantity is revised from <br /> "423"to"225". <br /> h. Bid item No. A149, "PSIPE VINCA MINOR (PERIWINKLE) QT POTS"deleted and <br /> replaced with "PSIPE PACHYSANDRA TERMINALIS 'GREEN SHEEN' (GREEN <br /> SHEEN JAPANESE SPURGE) 1 GAL POTS", and the quantity is revised from <br /> "1143"to"495". <br /> i. Bid Item No. A161 to be deleted and replaced with "NOT USED", and the <br /> quantity is changed from"1"to "0". <br /> j. Bid Item No. A166, the quantity is revised from"3"to"4". <br /> k. Bid Item No. A168 to be deleted and replaced with "NOT USED", and the <br /> quantity is revised from"2"to"0". <br /> I. Bid Item No. A170, the quantity is revised from"2"to"3". <br /> m. Bid Item No. A171, the FA cost amount of$5,000.00 is added. <br /> n. Bid Item No. A187, the quantity is revised from"95"to"454". <br /> o. Bid item No. B7, "STRUCTURAL CARBON STEEL— PEDESTRIAN UPGRADES" <br /> deleted and replaced "STRUCTURAL LOW ALLOY STEEL— PEDESTRIAN <br /> UPGRADES". <br /> CONTRACT PLANS <br /> 1. Replace Sheet No. 18 with attached: Drawing C5.0 has been revised by changing <br /> #2 CB from"Type A"to"Type II 48-IN DIAM." <br /> 2. Replace Sheets No. 94 through 115 with attached: Various details on the <br /> following drawings have been revised including: Gusset plate lines, cover plate lines, <br /> showing bolts on elevation and section views, and the Run-off diversion plate has been <br /> changed. <br /> a. Sheet No. 94 (Drawing S3.02) <br /> b. Sheet No. 95 (Drawing S3.03) <br /> c. Sheet No. 96 (Drawing 53.04) <br /> d. Sheet No. 97 (Drawing S3.05) <br /> e. Sheet No. 98 (Drawing S3.06) <br /> f. Sheet No. 99 (Drawing S3.07) <br /> g. Sheet No. 100 (Drawing S3.08) <br /> h. Sheet No. 101. (Drawing S3.09) <br /> i. Sheet No. 102 (Drawing S3.10) <br /> j. Sheet No. 103 (Drawing S3.11) <br /> k. Sheet No. 104 (Drawing S3.12) <br /> I. Sheet No. 105 (Drawing S3.13) <br /> m. Sheet No. 106 (Drawing S3.14) <br /> n. Sheet No. 107 (Drawing S3.15) <br /> o. Sheet No. 108 (Drawing S3.16) <br /> p. Sheet No. 109 (Drawing S3.17) <br /> q. Sheet No. 110 (Drawing 53.18) <br /> r. Sheet No. 111 (Drawing S3.19) <br /> s. Sheet No. 112 (Drawing S3.20) <br /> t. Sheet No. 113 (Drawing S3.21) <br /> u. Sheet No. 114 (Drawing S3.22) <br /> City of Everett Addendum No. 2 <br /> Project Bid <br /> ---------------- <br /> Grand Avenue Park Bridge Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.