My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 7/24/2017
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 7/24/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2021 10:13:12 AM
Creation date
7/31/2017 10:42:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
7/24/2017
Council Approval Date
7/5/2017
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Park Bridge
Public Works WO Number
PW3588
Tracking Number
0000801
Total Compensation
$13,789,438.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction 10/23/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc (ICI) 12/2/2019 Change Order 18
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 14
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 15
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 16
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 17
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 1/28/2020 Change Order 19
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 1/28/2020 Change Order 20
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 1/8/2021 Change Order 24
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 10/11/2018 Change Order 5
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 10/19/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 11/13/2018 Change Order 5
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 11/13/2018 Change Order 7
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 11/9/2020 Amendment 25
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 12/4/2018 Change Order 8
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 12/4/2018 Change Order 9
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 12/5/2018 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 3/26/2019 Change Order 10
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 3/26/2019 Change Order 11
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 4/1/2020 Change Order 21
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 4/28/2020 Change Order 22
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 5/1/2019 Change Order 12
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 5/30/2018 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 7/19/2021 Change Order 26
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 7/9/2019 Change Order 13
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Constuction Inc 5/4/2020 Change Order 23
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ITEM SECTION ITEM EST UNIT UNIT TOTAL <br /> NO. QTY PRICE PRICE <br /> GRAND AVENUE PARK BRIDGE <br /> SCHEDULE A- UTILITY BRIDGE <br /> PREPARATION <br /> Al 1-09.7 MOBILIZATION 1 LS <br /> A2 1-04.4SP UNEXPECTED SITE CHANGES 1 FA $15,000.00 $15,000.00 <br /> A3 1-05.4SP CONTRACTOR SURVEYING 1 LS <br /> A4 1-05.18SP RECORD DRAWINGS(MINIMUM BID= $5,000) 1 LS <br /> A5 1-07.11SP TRAINING 1,000 HR <br /> A6 1-07.15 SPCC PLAN 1 LS <br /> A7 1-08.3 PROGRESS SCHEDULE TYPE B(MINIMUM BID=$10,000) 1 LS <br /> A8 1 07.18SP BNSF TEMPORARY OCCUPANCY AND ACCESS 1 FA $120,000.00 $120,000.00 <br /> GRADING <br /> A9 2-01 CLEARING AND GRUBBING 3 ACRE <br /> A10 2-01SP TREE REMOVAL 16 EA <br /> All 2-01SP TREE PROTECTION 37 EA <br /> Al2 2-02SP REMOVAL OF STRUCTURES AND OBSTRUCTIONS 1 FA $10,000.00 $10,000.00 <br /> A13 2-02SP SAWING PAVEMENT 1,610 LF <br /> A14 2-02SP REMOVE CEMENT CONCRETE SIDEWALK 500 SY <br /> Al5 2-02SP REMOVE CURB AND GUTTER 375 LF <br /> Al6 2-07SP STREET CLEANING 36 HR <br /> A17 5-04SP PLANING BITUMINOUS PAVEMENT(0 TO 6"DEEP) 170 SY <br /> A18 2-02SP REMOVE EXISTING ASPHALT CONCRETE PAVEMENT 1,050 SY <br /> A19 7-14SP REMOVE AND DISPOSE OF EXISTING FIRE HYDRANTS 1 EA <br /> A20 2-02SP SALVAGE AND REPLACE PARK SIGN 1 LS <br /> GRADING <br /> A21 2-03 ROADWAY EXCAVATION 240 CY <br /> A22 2-03 ROADWAY EXCAVATION INCL. HAUL 520 CY <br /> A23 2-03 EMBANKMENT COMPACTION 240 CY <br /> A24 7-08SP STRUCTURE EXCAVATION CLASS B 975 CY <br /> A25 7-08SP STRUCTURE EXCAVATION CLASS B INCL. HAUL 1,000 CY <br /> A26 7-08SP GRAVEL BORROW 1,508 TON <br /> CITY OF EVERETT <br /> GRAND AVENUE PARK BRIDGE April 27,2017 <br /> WO#3588 P3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.