Interwest Construction Inc. 7/24/2017
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 7/24/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2021 10:13:12 AM
Creation date
7/31/2017 10:42:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
7/24/2017
Council Approval Date
7/5/2017
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Park Bridge
Public Works WO Number
PW3588
Tracking Number
0000801
Total Compensation
$13,789,438.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction 10/23/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc (ICI) 12/2/2019 Change Order 18
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 14
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 15
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 16
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 17
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 1/28/2020 Change Order 19
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 1/28/2020 Change Order 20
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 1/8/2021 Change Order 24
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 10/11/2018 Change Order 5
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 10/19/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 11/13/2018 Change Order 5
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 11/13/2018 Change Order 7
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 11/9/2020 Amendment 25
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 12/4/2018 Change Order 8
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 12/4/2018 Change Order 9
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 12/5/2018 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 3/26/2019 Change Order 10
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 3/26/2019 Change Order 11
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 4/1/2020 Change Order 21
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 4/28/2020 Change Order 22
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 5/1/2019 Change Order 12
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 5/30/2018 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 7/19/2021 Change Order 26
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 7/9/2019 Change Order 13
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Constuction Inc 5/4/2020 Change Order 23
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Answer—Shoring or Extra Excavation Class B is meant to cover the work required and <br /> directed by the engineer for excavation/shoring outside the trench limits shown on the plan. <br /> Question 15 <br /> Special Provision 2-02.5 shows numerous unit price items for"Remove (Item)". Bid Items for <br /> these unit price items have not been included in the bid schedule for work shown on <br /> plans. Please clarify or provide the appropriate bid items. <br /> Answer—The items provided in the bid list reflect the scope of the removal items. The <br /> additional items in the specification are not intended to be included in the bid list. <br /> Question 16 <br /> Special Provision 2-02.5 indicates that"All costs associated with removal and disposal of <br /> obstructions encountered during removal ... will be paid by force account ...." This section also <br /> says"Removal of items not listed in the Bid Form shall be considered as incidental ... and the <br /> costs thereof shall be included in the various items comprising the improvement." The two <br /> statements appear to be in conflict. Please clarify. <br /> Answer—Removal of Structures and Obstructions is meant to cover the extra removal cost of <br /> items not shown on the plans such as buried boulders, old seawalls, old sidewalks, etc. The <br /> second statement, "Removal of items not listed..." is meant to cover items shown on the plans <br /> that otherwise don't have a specific bid item. <br /> Question 17 <br /> Questions regarding Bid Item No. 171, Shoring Extra Excavation Class B: What exactly is this <br /> work? Why is this a Force Account item? <br /> Answer—From the standard spec 2-09.3(2), "2. Class B —All other Structure excavation shall <br /> be Class B. If this excavation requires cofferdams, shoring, or extra excavation, the work <br /> outside the neat lines of the Structure excavation Class B shall be classified as shoring or extra <br /> excavation Class B." This is payment for excavation or shoring required and directed by the <br /> engineer for work outside the trench limits shown on the plans. This is used to cover the <br /> unknown soil variability in the trench. It is a Force Account item because we cannot quantify <br /> how much soil will be unsuitable at the bottom of the trench or the means/methods used to <br /> perform the work. The common proposal price for bid item A171 is $5,000.00 and has been <br /> added to the replacement proposal form. <br /> Question 18 <br /> Will there be a One-Line Diagram provided for the Elevator equipment, showing elevator <br /> operation, including any required Fire Alarm Notification/control devices? <br /> Answer—All necessary details for bidding are included in plans and specifications. <br /> All other requirements of the contract documents remain in effect. <br /> City of rett <br /> FO y777� <br /> H-ather Griffin, P.E. <br /> Project Manager <br /> City of Everett Addendum No. 2 <br /> Project Bid <br /> Grand Avenue Park Bridge Page 5 <br />