Laserfiche WebLink
g. Sheet No 198 (Drawing E2.03) — revised lighting fixture from L05 to L09. <br /> h. Sheet No 199 (Drawing E2.04) — Panel Schedule 2A1 — Circuit #28 for building <br /> exterior lights is added. <br /> CLARIFICATIONS <br /> Question 1 <br /> What Bid Item does the electrical equipment/conduit/conductors required for the Elevator fall <br /> under? <br /> Answer—Wiring from the elevator controller to the hoistway is in the elevator bid section. <br /> However, mainline power provisions are by electrical and would not be part of the elevator bid <br /> section. Refer to Appendix A in the Special Provisions for details associated with the bid items <br /> for the elevator system. <br /> All other requirements of the contract documents remain in effect. <br /> City of Everett <br /> Heather Griffin, P.E. <br /> Project Manager <br /> city of Everett Addendum No. 3 <br /> Grand Avenue Park Bridge Project Bid — Page 2 <br /> Page 2 <br /> Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com-Always Verify Scale <br />