Laserfiche WebLink
,x04)Z7-A. <br /> 0001111P <br /> PUBLIC 11/011K5 <br /> PiZER ETT <br /> ADDENDUM NO. 4 <br /> GRAND AVENUE PARK BRIDGE <br /> W.O. #3588 <br /> MAY 3, 2017 <br /> NOTICE TO PLANHOLDERS: <br /> Addendum No. 4 contains the following revisions, additions, deletions and clarifications and is <br /> hereby made a part of the contract documents for the above named Project and shall be <br /> considered by all prospective bidders in submitting bids. <br /> Bidders must acknowledge receipt of Addendum No. 4 in the space provided on page P-14 in <br /> Division P, Proposal Signature Sheet. Failure to comply with this requirement may render the <br /> Bid non-responsive and may cause its rejection. This Addendum consists of 21 pages, including <br /> all revisions, attachments and details. <br /> The Bid date, time, and location for receipt of Bids are unchanged by this Addendum. <br /> 2:00 PM MAY 16, 2017 AT THE CITY CLERK'S OFFICE, 2930 WETMORE AVENUE. <br /> THE CONTRACT DOCUMENTS ARE MODIFIED AS FOLLOWS: <br /> SPECIAL PROVISIONS <br /> 1. Replace the following pages of the Special Provisions with attached: <br /> a. Division 1, page S2, lines 17 through 19: delete"In addition the power pole <br /> currently closest to the bridge's permanent location on the south side of the <br /> bridge will be moved further south, approximately an additional 10 feet away <br /> from the bridge."and replace with "In addition, the power poles will be <br /> relocated approximately as follows: 57 feet and 47 feet from the south truss and <br /> the north truss, respectively." <br /> b. Division 1, page S62, line 14: delete"June 1st and August 31St, 2017."and <br /> replace with "June 1st and August 31St, 2018." <br /> c. Division 6, page S152, lines 47 and 49: delete "aluminum panel"and replace <br /> with"type 5052 aluminum alloy panel", and add "with orbital finish"after <br /> "Finish: brushed". <br /> CONTRACT PLANS <br /> 1. Replace Sheet No. 71 with attached. Drawing S1.04 is revised with callout and <br /> section clarifications. <br /> 2. Replace Sheet No. 74 with attached. Drawing S1.07 is revised with clarifications to <br /> the elevation views. <br /> 3. Replace Sheet No. 76 with attached. Drawing S1.09 is revised to include detail <br /> reference. <br /> 4. Replace Sheet No. 84 with attached. Drawing S1.17 is revised to include additional <br /> bearing plate, filler plate, and angle details. <br /> City of Everett Addendum No. 4 <br /> Project Bid <br /> Grand Avenue Park Bridge Page 1 <br /> ige 1 Addendum#4 <br /> Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com-Always Verify Scale <br />