My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 7/24/2017
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 7/24/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2021 10:13:12 AM
Creation date
7/31/2017 10:42:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
7/24/2017
Council Approval Date
7/5/2017
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Park Bridge
Public Works WO Number
PW3588
Tracking Number
0000801
Total Compensation
$13,789,438.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction 10/23/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc (ICI) 12/2/2019 Change Order 18
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 14
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 15
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 16
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 17
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 1/28/2020 Change Order 19
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 1/28/2020 Change Order 20
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 1/8/2021 Change Order 24
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 10/11/2018 Change Order 5
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 10/19/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 11/13/2018 Change Order 5
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 11/13/2018 Change Order 7
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 11/9/2020 Amendment 25
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 12/4/2018 Change Order 8
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 12/4/2018 Change Order 9
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 12/5/2018 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 3/26/2019 Change Order 10
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 3/26/2019 Change Order 11
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 4/1/2020 Change Order 21
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 4/28/2020 Change Order 22
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 5/1/2019 Change Order 12
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 5/30/2018 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 7/19/2021 Change Order 26
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 7/9/2019 Change Order 13
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Constuction Inc 5/4/2020 Change Order 23
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. Replace Sheet No. 85 with attached. Drawing S1.18 is revised to correct the weld <br /> callout, in Detail 2. <br /> 6. Replace Sheet No. 87 with attached. Drawing 51.20 is revised to include the <br /> canopy detail. <br /> 7. Replace Sheet No. 146 with attached. Drawing S3.54 is revised to add missing <br /> bolts. <br /> 8. Replace Sheet No. 164 with attached. Drawing S6.03 is revised to provide missing <br /> steel sections. <br /> 9. Replace Sheet No. 172 with attached. Drawing 56.11 is revised to include detail <br /> clarifications. <br /> 10. Replace Sheet No. 9 with attached. Drawing C2.0 is revised with EX dumpster pad <br /> to remain. <br /> 11. Replace Sheet No. 21 with attached. Drawing C6.0 is revised with EX dumpster <br /> pad to remain. <br /> CLARIFICATIONS <br /> Question 1 <br /> Is there a way to access the .dxf files for the aluminum throw barrier panels? <br /> Answer - A digital geometry file (in DWG and DXF format) of the architectural railing <br /> perforation pattern is available to bidders for cost estimating purposes and can be obtained <br /> from the following location: <br /> Site = http://extranet.seattle.kpff.com <br /> Username = bidder <br /> Password = @ddendum4 <br /> Question 2 <br /> Page S2 of the special provisions indicates that the power pole will be re-located 10 feet from <br /> the bridge to the south — is this correct? Second, is it not possible for the transmission lines to <br /> be buried in the proximity of the bridge? Third, can a force account item be set up for de- <br /> energizing/lower lines. Will PUD provide the cost for both types of efforts to be used? <br /> Answer - PUD has specifcially indicated that by policy they will not allow undergrounding of <br /> the transmission lines. PUD will not be charging the contractor for de-energizing or dropping <br /> lines; although the contractor needs to coordinate with PUD. See pages S60 through S62 for <br /> further information. See attached figure, P and profile for refererence, and revision of Page S2 <br /> of the specifications for the correct power pole relocation. <br /> A summary of the Pre-bid meeting has also been attached for reference. <br /> All other requirements of the contract documents remain in effect. <br /> City of rett <br /> h 3C7qek <br /> Heather Griffin, P.E. <br /> Project Manager <br /> City of Everett Addendum No. 4 <br /> Grand Avenue Park Bridge Project Bid Page 2 <br /> Page 2 <br /> Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com-Always Verify Scale <br />
The URL can be used to link to this page
Your browser does not support the video tag.