Laserfiche WebLink
5. Replace Sheet No. 85 with attached. Drawing S1.18 is revised to correct the weld <br /> callout, in Detail 2. <br /> 6. Replace Sheet No. 87 with attached. Drawing 51.20 is revised to include the <br /> canopy detail. <br /> 7. Replace Sheet No. 146 with attached. Drawing S3.54 is revised to add missing <br /> bolts. <br /> 8. Replace Sheet No. 164 with attached. Drawing S6.03 is revised to provide missing <br /> steel sections. <br /> 9. Replace Sheet No. 172 with attached. Drawing 56.11 is revised to include detail <br /> clarifications. <br /> 10. Replace Sheet No. 9 with attached. Drawing C2.0 is revised with EX dumpster pad <br /> to remain. <br /> 11. Replace Sheet No. 21 with attached. Drawing C6.0 is revised with EX dumpster <br /> pad to remain. <br /> CLARIFICATIONS <br /> Question 1 <br /> Is there a way to access the .dxf files for the aluminum throw barrier panels? <br /> Answer - A digital geometry file (in DWG and DXF format) of the architectural railing <br /> perforation pattern is available to bidders for cost estimating purposes and can be obtained <br /> from the following location: <br /> Site = http://extranet.seattle.kpff.com <br /> Username = bidder <br /> Password = @ddendum4 <br /> Question 2 <br /> Page S2 of the special provisions indicates that the power pole will be re-located 10 feet from <br /> the bridge to the south — is this correct? Second, is it not possible for the transmission lines to <br /> be buried in the proximity of the bridge? Third, can a force account item be set up for de- <br /> energizing/lower lines. Will PUD provide the cost for both types of efforts to be used? <br /> Answer - PUD has specifcially indicated that by policy they will not allow undergrounding of <br /> the transmission lines. PUD will not be charging the contractor for de-energizing or dropping <br /> lines; although the contractor needs to coordinate with PUD. See pages S60 through S62 for <br /> further information. See attached figure, P and profile for refererence, and revision of Page S2 <br /> of the specifications for the correct power pole relocation. <br /> A summary of the Pre-bid meeting has also been attached for reference. <br /> All other requirements of the contract documents remain in effect. <br /> City of rett <br /> h 3C7qek <br /> Heather Griffin, P.E. <br /> Project Manager <br /> City of Everett Addendum No. 4 <br /> Grand Avenue Park Bridge Project Bid Page 2 <br /> Page 2 <br /> Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com-Always Verify Scale <br />