My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 7/24/2017
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 7/24/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2021 10:13:12 AM
Creation date
7/31/2017 10:42:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
7/24/2017
Council Approval Date
7/5/2017
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Park Bridge
Public Works WO Number
PW3588
Tracking Number
0000801
Total Compensation
$13,789,438.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction 10/23/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc (ICI) 12/2/2019 Change Order 18
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 14
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 15
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 16
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 17
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 1/28/2020 Change Order 19
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 1/28/2020 Change Order 20
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 1/8/2021 Change Order 24
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 10/11/2018 Change Order 5
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 10/19/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 11/13/2018 Change Order 5
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 11/13/2018 Change Order 7
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 11/9/2020 Amendment 25
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 12/4/2018 Change Order 8
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 12/4/2018 Change Order 9
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 12/5/2018 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 3/26/2019 Change Order 10
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 3/26/2019 Change Order 11
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 4/1/2020 Change Order 21
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 4/28/2020 Change Order 22
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 5/1/2019 Change Order 12
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 5/30/2018 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 7/19/2021 Change Order 26
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 7/9/2019 Change Order 13
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Constuction Inc 5/4/2020 Change Order 23
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a • <br /> o f I +,� t' - ri,, .v•,-;,,;.„(k e______ __,.. ``,fit a` . <br /> 1 _ <br /> P, y q <br /> �a 11 f Z Street Ground Elevation . 0 <br /> ,• L •'� ...--.. .iL" 1/, : `i.` �,, C Poles 10 <br /> tt Z, <br /> r.<' Pole New/Replaced <br /> J <br /> �, x. ' .. ` ` �' �� Pole Original <br /> rE <br /> =n - <br /> Ito <br /> > <br /> 4 <br /> AE <br /> Q <br /> l . - <br /> �a T 1 <br /> '' <br /> r to <br /> t' 1 <br /> .�. .a,-: .,. _.. tea, a _r., m.. . . . ...� ;`•• r,:: -. i r. .v... g <br /> sic , i a) <br /> '" ' r y <br /> e.. H 4.,,e, <br /> J <br /> R1r 3 <br /> *..8.�' <br /> I:, 1 F''''•••ti 4 E .. ,- $ u 1, E i f, .... V--.., .,.' .:,--i ' . i 2 <br /> 111 11111 MI It , <br /> 160.0 ' <br /> C <br /> C <br /> O <br /> U <br /> 140.0 --- A-Requiredinsulator wiltbe on top— — - - — — — N <br /> of these(2)Poles. The top cm <br /> of the Insulator wlll be nearco as <br /> 120.0 a 90'Elevation = <br /> 100.0 — — — — — — — — — <br /> Ground Elevation Grand Ave 8 <br /> ,iiiiiillwall <br /> ci <br /> • c <br /> 80.0 — — — — — — — — — <br /> Topof Bridge Toms under Power Lim '� <br /> O <br /> 60.0 — — — m <br /> 4, ... • • • C� <br /> m' <br /> as <br /> 40.0 — - <br /> 0 <br /> X <br /> W <br /> 20.0 — — — <br /> a) <br /> Ground Elevation W Marine View Dr <br /> 0.0 <br /> CO <br /> 0 <br /> Horizontal Scale: 1"=1[O <br /> cGrand Ave Bridge Plan & Profile <br /> cry of Everett Pudic worksili <br /> UtUtilityMapping Vertical Scale: 1"-4070 'o <br /> Document Path:G:tBasemapaPlanProhle\Grara_Ave_Bridge\GrandAveBndgePlanProllle&mple.road Date:4/28/2016) <br /> ea c <br /> a- a- <br />
The URL can be used to link to this page
Your browser does not support the video tag.