Interwest Construction Inc. 7/24/2017
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 7/24/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2021 10:13:12 AM
Creation date
7/31/2017 10:42:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
7/24/2017
Council Approval Date
7/5/2017
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Park Bridge
Public Works WO Number
PW3588
Tracking Number
0000801
Total Compensation
$13,789,438.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction 10/23/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc (ICI) 12/2/2019 Change Order 18
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 14
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 15
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 16
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 17
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 1/28/2020 Change Order 19
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 1/28/2020 Change Order 20
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 1/8/2021 Change Order 24
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 10/11/2018 Change Order 5
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 10/19/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 11/13/2018 Change Order 5
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 11/13/2018 Change Order 7
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 11/9/2020 Amendment 25
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 12/4/2018 Change Order 8
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 12/4/2018 Change Order 9
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 12/5/2018 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 3/26/2019 Change Order 10
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 3/26/2019 Change Order 11
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 4/1/2020 Change Order 21
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 4/28/2020 Change Order 22
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 5/1/2019 Change Order 12
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 5/30/2018 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 7/19/2021 Change Order 26
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 7/9/2019 Change Order 13
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Constuction Inc 5/4/2020 Change Order 23
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
General Note #3 on Sheet S0.01 for clarification of concrete classes. Bid Item No. A89 includes <br /> shaft cap concrete Class 4000. Bid Item No. B3 is deck concrete. Bid Item No. B2 is West, East, <br /> North walls of the elevator shaft and other concrete in the elevator shaft. <br /> Question 4 <br /> What bid item is the concrete seal work paid under? <br /> Answer— Bid Item No. A90. See General Notes and Bid Item List. <br /> Question 5 <br /> What bid item does the channel cap on the throw barrier go into? <br /> Answer—Bid Item No. B24. <br /> Question 6 <br /> What is the sheen level of the black coatings to be applied to the bridge structure? <br /> Answer—The complete painting specs are provided in Section 6-07 of the WSDOT Standard <br /> Specifications for Road, Bridge, and Municipal Construction, 2016, including amendments <br /> through January 2017. <br /> Question 7 <br /> On the bottom left corner of Sheet No. 14/Drawing C4.1 shows a 30" DI FLxPE spool on the CS <br /> line. What bid item is 30"ductile iron pipe? <br /> Answer—The small incidental spool of flanged ductile iron required to transition to a plain end <br /> pipe can be considered part of Bid Item No. A80 "30-INCH DIAM. FLEXIBLE COUPLING <br /> (DOUBLE BALL WITH EXP)"as it can be considered part of the"connection to adjacent pipes" <br /> work. <br /> Question 8 <br /> What kind of transitions are we supposed to use between the different piping materials? <br /> Answer— Pipe type transition couplings between 30"C-905 PVC or 36"SWPSSP and Ductile <br /> iron are not necessary as the pipe ODs of DI and C-905 PVC are the same, the plain end PVC <br /> pipe will fit into the bell of the DI pipe and vice versa. The transition between the ductile iron <br /> and PVC should have the same restraint system as the adjacent pipes, if any. 12"steel to 12" <br /> DI should be made with a coupling that is designed for those two materials and should be <br /> restrained where called out on the drawings. The contractor has the flexibility to use any <br /> coupling system including flanges, restraint rings, etc. that can join the materials and provide <br /> the restraint as called out on the drawings. <br /> Question 9 <br /> On the 12", 30", &36"steel piping it looks like it shows it all being field welded. Can we use <br /> flanges, grooved couplings, or something else to connect it all together instead of having the <br /> contractor's field weld all of this piping? <br /> Answer— For basis of bid, steel pipe should be assumed to be field or shop welded unless <br /> otherwise noted in the drawings. Substitutions will be considered during the submittal/shop <br /> drawing phase of construction. <br /> Question 10 <br /> On Sheet No. 16/Drawing C4.3: detail 3, is the 18" riser pipe on the cleanout ductile iron or <br /> something else? It also calls out for 20 — 1-1/4"bolts for the blind flange, but a 150# flange <br /> has 16 — 1-1/8" bolts. <br /> Answer—Cleanout detail is 3/C4.4. As called out on the detail, the riser pipe should be DI. <br /> The number and type of bolts should match the standard flange bolt hole layout and thickness. <br /> City of Everett Addendum No. 5 <br /> Grand Avenue Park Bridge Project Bid Page 2 <br /> Page 2 <br /> Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com-Always Verify Scale <br />