Interwest Construction Inc. 7/24/2017
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 7/24/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2021 10:13:12 AM
Creation date
7/31/2017 10:42:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
7/24/2017
Council Approval Date
7/5/2017
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Park Bridge
Public Works WO Number
PW3588
Tracking Number
0000801
Total Compensation
$13,789,438.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction 10/23/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc (ICI) 12/2/2019 Change Order 18
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 14
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 15
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 16
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 17
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 1/28/2020 Change Order 19
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 1/28/2020 Change Order 20
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 1/8/2021 Change Order 24
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 10/11/2018 Change Order 5
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 10/19/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 11/13/2018 Change Order 5
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 11/13/2018 Change Order 7
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 11/9/2020 Amendment 25
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 12/4/2018 Change Order 8
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 12/4/2018 Change Order 9
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 12/5/2018 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 3/26/2019 Change Order 10
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 3/26/2019 Change Order 11
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 4/1/2020 Change Order 21
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 4/28/2020 Change Order 22
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 5/1/2019 Change Order 12
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 5/30/2018 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 7/19/2021 Change Order 26
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 7/9/2019 Change Order 13
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Constuction Inc 5/4/2020 Change Order 23
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Question 2 <br /> Are costs associated with Electrical scope within the Utility Room, Elevator Machine Room, <br /> Elevator Control Room, Elevator Pit, Elevator Landing (including distribution equipment, feeders, <br /> mechanical equipment connections, lighting, power devices & conduit/wire) to be included in <br /> Schedule B Bid Items B19 (Bridge and Tower Electrical, Conduit, Wiring and Junction Boxes) <br /> and B22 (Bridge Tower Lighting)? <br /> Answer—Yes, all items associated with Elevator cost are in Schedule B. <br /> Question 3 <br /> Addendum 3 drawing E2.02 added a detail 6/E2.02 (connections to steel bridge, structural <br /> steel, truss, stringers). What fixture type is this detail associated with? <br /> Answer—Detail 6 on Drawing E2.02 is a generic detail for all fixtures mounted to structural <br /> steel intended to highlight the introduction of UHMW-PE separators between dissimilar metals. <br /> Question 4 <br /> E2.01 Detail 4 is a raceway support detail intended to represent the typical hanging support <br /> system. This detail identifies fiberglass tube spacers and 1-1/5"fiberglass strut base. General <br /> notes (on most plans including those issued in Addendum 3) specify stainless steel unistrut <br /> support, hangers, rods, hardware, fasteners etc. What material will be used? <br /> Answer—Revised drawing does not reference any fiberglass material. Addendum No. 3 <br /> provides important changes to the raceway support detail. <br /> Question 5 <br /> The surface mounted junction boxes (tap boxes) are not specifically identified by a WSDOT <br /> detail. Please provide a reference to the applicable WSDOT detail and/or provide the box <br /> size/measurements for all tap boxes on the bridge Utility Level. <br /> Answer - Junction boxes shall be sized by contractor in the field; contractor to follow WSDOT <br /> Specifications. No specific WSDOT junction box detail has been referenced in the plans or <br /> contract provisions. <br /> Question 6 <br /> Would the City consider using a force account item similar to Bid Item A99 — Removing Shaft <br /> Obstructions in order to cover obstructions that impede cofferdam installation? <br /> Answer - The Contractor shall include risk associated with cofferdam obstructions in the bid <br /> price. See revised plan sheet S0.02 for clarification and additional requirements regarding <br /> cofferdam removal. Bid Item No. A88 shall include all costs for installation of the cofferdam, <br /> removal of obstructions, and removal of the upper portion of the cofferdam per revised sheet <br /> S0.02 submitted with this addendum, in addition to all other requirements in the existing <br /> contract documents. <br /> Question 7 <br /> Are there conflicting statements in the special provisions related to cost/payment for the <br /> railroad crossing to be built: It appears that S70 lines 50 through 52 and S71 lines 1 through 6 <br /> conflicts with page S72 lines 14 through 27? <br /> Answer — No these statements do not conflict. No work (***None***, S71 line 1) has been <br /> described to be performed by the Railroad Company (with its own forces, at no cost to the <br /> Contractor). <br /> City of Everett Addendum No. 7 <br /> Grand Avenue Park Bridge Project Bid Page 3 <br /> age 3 <br /> Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com-Always Verify Scale <br />