4. Replace Sheet No. 67 with attached: Drawing S0.05 has been revised to clarify <br /> railroad impact. <br /> 5. Replace Sheet No. 70 with attached: Drawing S1.03 has been revised to clarify <br /> FM pipe detail. <br /> 6. Replace Sheet No. 71 with attached: Drawing S1.04 has been revised to correct <br /> pipe location on Section A. <br /> 7. Replace Sheet No. 174 with attached: Drawing S7.01 has been revised to clarify <br /> pipe view on Section C. <br /> 8. Replace Sheet No. 175 with attached: Drawing S7.02 has been revised to clarify <br /> pipe support. <br /> 9. Replace Sheet No. 192 with attached: Drawing E1.01 has been revised to show <br /> detail callouts and changing NEMA 3R to NEMA 4X on Flag Note 7. <br /> 10. Replace Sheet No. 197 with attached: Drawing E2.02 has been revised to change <br /> NEMA 3R to NEMA 4X on Flag Note 4. <br /> CLARIFICATIONS <br /> Question 1 <br /> To what extent will the train free window be allowed for railroad work? Can it be anticipated <br /> that one of the other five lanes of railroad tracks can be used for train diversion so that work <br /> may be paused but not removed from the tracks? In addition, what is the railroad closure <br /> duration? <br /> Answer — The railroad impact times shown on Drawings S0.03 through S0.05 represent the <br /> times provided to the BNSF Railway Company during the BNSF review process. These sheets <br /> are now revised per this addendum to reflect consistency with the contract provisions. <br /> The contractor must plan, schedule, coordinate and conduct all work so as to not cause any <br /> delays to trains per the final agreement between BNSF and the Contractor (Exhibit "C-1"). <br /> Appendix page G1-56 (Volume 2 of 2) of the Contract Provisions, provides clear means for the <br /> Contractor and BNSF to establish acceptable windows of operation based on real and actual <br /> time frames which are to be inlcuded in the Schedule sumbitted to BNSF for review: <br /> "Railway and Contractor will establish mutually agreeable work windows for the project. <br /> Railway has the right at any time to revise or change the work windows due to train operations <br /> or service obligations. Railway will not be responsible for any additional costs or expenses <br /> resulting from a change in work windows. Additional costs or expenses resulting from a change <br /> in work windows shall be accounted for in Contractor's expenses for the project." <br /> Once provided a real time schedule the Railway can more accurately evaluate the availability of <br /> the windows which mutually accommodate the need of BNSF to maintain uninterrupted service <br /> and the Contractor to construct the bridge. It was anticipated during design that there will be a <br /> range of times available, however, the designer and the City cannot set these times, and BNSF <br /> will not establish these times until such time as a construction schedule and means and <br /> methods for construction is submitted for review per the requirements of the Contract Bid <br /> Documents and the agreement between BNSF and the Contractor. <br /> City of Everett Addendum No. 7 <br /> Project Bid <br /> Grand Avenue Park Bridge Page 2 <br /> Page 2 <br /> Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com -Always Verify Scale <br />