My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 7/24/2017
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 7/24/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2021 10:13:12 AM
Creation date
7/31/2017 10:42:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
7/24/2017
Council Approval Date
7/5/2017
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Park Bridge
Public Works WO Number
PW3588
Tracking Number
0000801
Total Compensation
$13,789,438.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction 10/23/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc (ICI) 12/2/2019 Change Order 18
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 14
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 15
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 16
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 17
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 1/28/2020 Change Order 19
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 1/28/2020 Change Order 20
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 1/8/2021 Change Order 24
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 10/11/2018 Change Order 5
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 10/19/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 11/13/2018 Change Order 5
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 11/13/2018 Change Order 7
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 11/9/2020 Amendment 25
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 12/4/2018 Change Order 8
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 12/4/2018 Change Order 9
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 12/5/2018 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 3/26/2019 Change Order 10
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 3/26/2019 Change Order 11
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 4/1/2020 Change Order 21
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 4/28/2020 Change Order 22
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 5/1/2019 Change Order 12
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 5/30/2018 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 7/19/2021 Change Order 26
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 7/9/2019 Change Order 13
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Constuction Inc 5/4/2020 Change Order 23
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 Controlled Density Fill: Controlled Density Fill shall be used in lieu of select <br /> 2 trench backfill for fill above pipe zone at all street crossings and other areas, as <br /> 3 directed by the Engineer, where high density backfill is required to prevent <br /> 4 settlement of roadway pavement patches. <br /> 5 <br /> 6 Controlled Density Fill shall be in accordance with Section 2-09.3(1)E. <br /> 7 <br /> 8 7-08,3(4) Plugging Existing Pipe <br /> 9 Section 7-08.3(4) is deleted and replaced with the following: <br /> 10 <br /> 11 (City of Everett GSP) <br /> 12 Where shown on the plans, existing sanitary sewer and storm drainage pipe shall <br /> 13 be removed or plugged and sealed with cement grout and abandoned in place. <br /> 14 <br /> 15 7-08.3(5) Submittals <br /> 16 (******) <br /> 17 Contractor shall submit a work plan to Engineer for review and approval, stamped <br /> 18 by a licensed Washington State Professional Engineer, showing the schedule, <br /> 19 sequencing, products, trench support system, and arrangement of pipes and <br /> 20 appurtenances to be installed in West Marine View Drive prior to ordering materials. <br /> 21 <br /> 22 Measurement <br /> 23 Section 7-08.4 is deleted and replaced with the following: <br /> 24 <br /> 25 (******) <br /> 26 Gravel Borrow shall be measured by the ton, including haul. <br /> 27 <br /> 28 Controlled Density Fill shall be measured in place by the cubic yard to the neat lines as <br /> 29 shown on the plans. <br /> 30 <br /> 31 Natural Sand shall be measured by the ton, including haul. <br /> 32 <br /> 33 All costs associated with plugging and abandoning existing pipe shall be included in the <br /> 34 unit contract price for pipe and no additional compensation will be allowed. Where <br /> 35 abandoned pipe and manholes are to be filled with controlled density fill, the cost of this <br /> 36 work shall be measured and paid for by the unit price bid per cubic yard for controlled <br /> 37 density fill. <br /> 38 <br /> 39 Crushed Surfacing Base Course shall be measured by the ton, including haul. <br /> 40 <br /> 41 Foundation Material Class A shall be measured by the ton, including haul. <br /> 42 <br /> 43 Excavation of the trench will be measured as Structure excavation Class B including <br /> 44 haul, by the cubic yard as specified in Section 2-09. When excavation outside the <br /> 45 trench neat lines shown on the contract plans is necessary, excavation will be <br /> 46 measured to the limits ordered by the Engineer. <br /> 47 <br /> 48 Payment <br /> 49 Section 7-08.5 is deleted and replaced with the following: <br /> 50 (******) <br /> CITY OF EVERETT <br /> GRAND AVENUE PARK BRIDGE May 9,2017 <br /> WO#3588 8208 <br /> Page 6 <br /> Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com-Always Verify Scale <br />
The URL can be used to link to this page
Your browser does not support the video tag.