My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 7/24/2017
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 7/24/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2021 10:13:12 AM
Creation date
7/31/2017 10:42:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
7/24/2017
Council Approval Date
7/5/2017
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Park Bridge
Public Works WO Number
PW3588
Tracking Number
0000801
Total Compensation
$13,789,438.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction 10/23/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc (ICI) 12/2/2019 Change Order 18
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 14
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 15
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 16
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 17
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 1/28/2020 Change Order 19
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 1/28/2020 Change Order 20
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 1/8/2021 Change Order 24
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 10/11/2018 Change Order 5
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 10/19/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 11/13/2018 Change Order 5
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 11/13/2018 Change Order 7
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 11/9/2020 Amendment 25
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 12/4/2018 Change Order 8
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 12/4/2018 Change Order 9
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 12/5/2018 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 3/26/2019 Change Order 10
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 3/26/2019 Change Order 11
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 4/1/2020 Change Order 21
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 4/28/2020 Change Order 22
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 5/1/2019 Change Order 12
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 5/30/2018 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 7/19/2021 Change Order 26
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 7/9/2019 Change Order 13
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Constuction Inc 5/4/2020 Change Order 23
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 and as outlined in these specifications and in the Standard Specifications shall be <br /> 2 included in the *** lump sum cost for "Structural LowAlloy Steel" ***. <br /> 3 <br /> 4 (June 26, 2000 WSDOT GSP) <br /> 5 Bridge Supported Utilities <br /> 6 All costs in connection with placing *** utility support elements *** through the <br /> 7 superstructure of *** the Grand Avenue Park Bridge and the West Abutment Utility Shaft <br /> 8 *** as shown in the Plans, including all *** supports, connections, etc ***, shall be <br /> 9 included in the *** unit prices for the applicable utility***. <br /> 10 <br /> 11 (June 26, 2000 WSDOT GSP) <br /> 12 No additional compensation will be made by reason of any delay or other expense to <br /> 13 the Contractor caused by coordination with the utility company or by installing utility <br /> 14 company furnished items. However, any unavoidable delays to the Contractor caused <br /> 15 by coordination with the utility company or resulting from installing utility company <br /> 16 furnished items will be adjusted in accordance with Section 1-08.8. <br /> 17 <br /> 18 Steel Structures <br /> 19 <br /> 20 Materials <br /> 21 <br /> 22 Section 6-03.2 is supplemented with the following: <br /> 23 <br /> 24 r******) <br /> 25 Structural Steel <br /> 26 <br /> Bridge Element Steel type Grade <br /> Truss Bottom Chord AASHTO M270M/M 270 50W <br /> Truss Top Chord, Verticals, Diagonals, AASHTO M270M/M 270 50W <br /> Longitudinal Bracings <br /> Truss Gusset Plates Top Chord AASHTO M270M/M 270 50W <br /> Truss Gusset Plates Bot. Chord AASHTO M270M/M 270 50W <br /> Truss Lateral Members (Top Only) AASHTO M270M/M 270 50W <br /> Truss Lateral Members AASHTO M270M/M 270 50W <br /> Truss MO-LO AASHTO M270M/M 270 50W <br /> Other Vertical And Horizontal Connection AASHTO M270M/M 270 50 <br /> Plates Everywhere <br /> 18" Box Braces At West Tower AASHTO M270M/M 270 50 <br /> Perimeter 33" Box At West Tower AASHTO M270M/M 270 50 <br /> Perimeter HSS20x4 Box Along Stairs At AASHTO M270M/M 270 50 <br /> West Tower <br /> Floorbeams, Bracings AASHTO M270M/M 270 50 <br /> Stringers AASHTO M270M/M 270 50 <br /> Truss Bearings (5 Total) AASHTO M270M/M 270 50 <br /> Transition Span Outrigger Brace (W12x50) AASHTO M270M/M 270 50W <br /> 36 Inch SD Pipe AASHTO M270M/M 270 50 <br /> 30 Inch CS Pipe AASHTO M270M/M 270 50 <br /> 12 Inch FM Pipe AASHTO M270M/M 270 50 <br /> 6 Inch Drain Pipe DUCTILE IRON - <br /> Nuts, Bolts,Washers AASHTO M 164 <br /> Nuts, Bolts,Washers AASHTO M 164 TYPE 3 <br /> Anchor Bolts, Nuts,Washers ASTM F1554 105 <br /> CITY OF EVERETT <br /> GRAND AVENUE PARK BRIDGE May 18,2017 <br /> WO#3588 8144 <br /> tge 9 <br /> Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com-Always Verify Scale <br />
The URL can be used to link to this page
Your browser does not support the video tag.