My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 7/24/2017
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 7/24/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2021 10:13:12 AM
Creation date
7/31/2017 10:42:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
7/24/2017
Council Approval Date
7/5/2017
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Park Bridge
Public Works WO Number
PW3588
Tracking Number
0000801
Total Compensation
$13,789,438.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction 10/23/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc (ICI) 12/2/2019 Change Order 18
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 14
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 15
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 16
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 17
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 1/28/2020 Change Order 19
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 1/28/2020 Change Order 20
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 1/8/2021 Change Order 24
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 10/11/2018 Change Order 5
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 10/19/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 11/13/2018 Change Order 5
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 11/13/2018 Change Order 7
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 11/9/2020 Amendment 25
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 12/4/2018 Change Order 8
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 12/4/2018 Change Order 9
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 12/5/2018 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 3/26/2019 Change Order 10
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 3/26/2019 Change Order 11
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 4/1/2020 Change Order 21
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 4/28/2020 Change Order 22
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 5/1/2019 Change Order 12
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 5/30/2018 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 7/19/2021 Change Order 26
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 7/9/2019 Change Order 13
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Constuction Inc 5/4/2020 Change Order 23
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 (******) <br /> 2 Structural Steel Designations and Painting Program <br /> Bridge Element Painted (note 1) Notes <br /> Truss Bottom Chord No. Except limited top side 2,6 <br /> Truss Top Chord, Verticals, Diagonals, No. <br /> Longitudinal Bracings <br /> Truss Gusset Plates Top Chord No. Except U16 3 <br /> Truss Gusset Plates Bot. Chord No. Except inside face 3 <br /> Truss Lateral Members (Top Only) No—limited range 4 <br /> Truss Lateral Members Yes 5 <br /> Truss MO-LO Yes (All Around) 6 <br /> Other Vertical And Horizontal Connection Yes <br /> Plates Everywhere <br /> 18" Box Braces At West Tower Yes <br /> Perimeter 33" Box At West Tower Yes <br /> Perimeter HSS20x4 Box Along Stairs At Yes <br /> West Tower <br /> Floorbeams, Bracings Yes 7 <br /> Stringers Yes 7 <br /> Truss Bearings (5 Total) Yes 8 <br /> Transition Span Outrigger Brace (W12x50) No <br /> 36 Inch SD Pipe Yes 9 <br /> 30 Inch CS Pipe Yes 9 <br /> 12 Inch FM Pipe Yes 9 <br /> 6 Inch Drain Pipe No <br /> Nuts, Bolts,Washers Yes 10 <br /> Nuts, Bolts,Washers Black weather - no 11 <br /> Anchor Bolts, Nuts,Washers No - HDG 12 <br /> 3 <br /> 4 Structural Steel and Painting Notes: <br /> 5 1. Paint per the project specifications. Color is black everywhere paint is called <br /> 6 out. All Grade 50W weathering steel shall receive a SP-6 sandblast. <br /> 7 2. Bottom Chord (BC): Paint top side of top plate on bottom chord between and <br /> 8 flush within the limits of the outside edge of the gusset plate at each nodal <br /> 9 point. Do not paint the open portion between adjacent gusset plates. <br /> 10 3. (BC) Gusset Plates: Paint only the inside face (facing chord) of all bottom chord <br /> 11 gusset plates. Paint both sides of the gusset plates at U16, LO, L1 and U1. <br /> 12 4. Do not paint the top chord lateral elements between UO and U4. <br /> 13 5. Paint the horizontal truss lateral elements located below the lower deck, <br /> 14 transition deck, upper deck, and utility deck including the sloped laterals <br /> 15 between MO and the floor beam at LO. <br /> 16 6. Paint all sides of the truss element MO-LO (N&S Truss). <br /> 17 7. Paint all stringers, floor beams, bracings and framing steel including angles <br /> 18 located anywhere on the plans, including, but not limited to, below the upper <br /> 19 deck, lower deck, utility deck, transition deck, stairs, roof, and elevator shaft. <br /> 20 8. Paint all steel comprising the bearings regardless of the type of steel unless it is <br /> 21 stainless steel. Do not paint stainless steel anywhere. If steel is not called out <br /> 22 on the plan use the steel shown on page S144. <br /> 23 9. Paint pipes beginning at flex joint near L15, paint along entire bridge length, <br /> 24 down west tower shaft to 2 feet above the concrete slab at 17.17 feet. This <br /> 25 includes all attachments, connections, and support elements associated with <br /> 26 these pipes. Paint the flex joint per Manufacturer's instructions or Engineer's <br /> CITY OF EVERETT <br /> GRAND AVENUE PARK BRIDGE May 18,2017 <br /> WO#3588 S157 <br /> Page 10 <br /> Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com-Always Verify Scale <br />
The URL can be used to link to this page
Your browser does not support the video tag.