My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 7/24/2017
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 7/24/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2021 10:13:12 AM
Creation date
7/31/2017 10:42:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
7/24/2017
Council Approval Date
7/5/2017
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Park Bridge
Public Works WO Number
PW3588
Tracking Number
0000801
Total Compensation
$13,789,438.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction 10/23/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc (ICI) 12/2/2019 Change Order 18
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 14
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 15
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 16
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 17
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 1/28/2020 Change Order 19
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 1/28/2020 Change Order 20
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 1/8/2021 Change Order 24
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 10/11/2018 Change Order 5
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 10/19/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 11/13/2018 Change Order 5
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 11/13/2018 Change Order 7
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 11/9/2020 Amendment 25
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 12/4/2018 Change Order 8
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 12/4/2018 Change Order 9
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 12/5/2018 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 3/26/2019 Change Order 10
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 3/26/2019 Change Order 11
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 4/1/2020 Change Order 21
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 4/28/2020 Change Order 22
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 5/1/2019 Change Order 12
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 5/30/2018 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 7/19/2021 Change Order 26
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 7/9/2019 Change Order 13
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Constuction Inc 5/4/2020 Change Order 23
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 Tnemec Company Inc: "Dur A Pell GS/Series 626 <br /> 2 ProSoCo, Inc. "Blok-Guard & Graffiti Control Ultra 15" <br /> 3 CSI Silicones "Si-Coat 531" <br /> 4 <br /> 5 6-07.6(3) Construction Requirements <br /> 6 Refer notes on the drawings for areas to receive painting. At end of this Section is a <br /> 7 general guide to the painting requirements. <br /> 8 <br /> 9 Painting and finishing of all exposed-to-view interior and exterior surfaces, except as <br /> 10 otherwise indicated or specified. <br /> 11 <br /> 12 Paint all surfaces unless otherwise indicated, scheduled, factory finished or indicated to <br /> 13 receive a finish in other Sections of the specifications. <br /> 14 <br /> 15 Field painting of factory finished equipment is not required. <br /> 16 <br /> 17 Touch-up paint all blemished or otherwise disfigured paint on all surfaces which occur <br /> 18 prior to acceptance of the building by the Owner. <br /> 19 <br /> 20 Unless specifically mentioned in technical sections to receive factory finish, paint all <br /> 21 these items occurring within the plane, the same as adjacent similar materials or areas. <br /> 22 If finish is not designated, the Architect will select these from the materials systems <br /> 23 specified. <br /> 24 <br /> 25 6-07.6(3)A General <br /> 26 Before proceeding with any work, the Contractor shall inspect the site, carefully <br /> 27 check all surfaces to be painted, and verify conditions affecting the work. The <br /> 28 Contractor shall immediately notify the Engineer of any discrepancy requiring <br /> 29 remediation. <br /> 30 <br /> 31 The Contractor shall apply paint per manufacturer's specifications and <br /> 32 recommendations. <br /> 33 <br /> 34 The Contractor is responsible for site cleanup after installation. The Contractor shall <br /> 35 apply paint at the locations indicated on the drawings. Protect the paint while wet <br /> 36 from water or other construction damage. Repair any damage to painted surfaces. <br /> 37 <br /> 38 The Contractor shall install, and gain approval for, a mock-up of the field applied <br /> 39 paint for Architect's review and approval of exterior visual features and <br /> 40 workmanship prior to field application of the remainder of the work. <br /> 41 <br /> 42 <br /> 43 <br /> 44 <br /> 45 <br /> 46 General: Provide applied paint mock-ups as indicated and meeting the following: <br /> 47 <br /> 48 Use materials, fabrication and installation methods identical with those <br /> 49 indicated for Work. Simulate actual construction conditions as accurately as <br /> 50 possible. <br /> 51 <br /> 52 Approval: <br /> CITY OF EVERETT <br /> GRAND AVENUE PARK BRIDGE May 18,2017 <br /> WO#3588 5159 <br /> Page 12 <br /> Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com-Always Verify Scale <br />
The URL can be used to link to this page
Your browser does not support the video tag.