My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Interwest Construction Inc. 7/24/2017
>
Contracts
>
Capital Contract
>
Interwest Construction Inc. 7/24/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2021 10:13:12 AM
Creation date
7/31/2017 10:42:03 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Interwest Construction Inc.
Approval Date
7/24/2017
Council Approval Date
7/5/2017
Department
Public Works
Department Project Manager
Heather Griffin
Subject / Project Title
Grand Avenue Park Bridge
Public Works WO Number
PW3588
Tracking Number
0000801
Total Compensation
$13,789,438.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Interwest Construction 10/23/2017 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc (ICI) 12/2/2019 Change Order 18
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 14
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 15
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 16
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc 10/22/2019 Change Order 17
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 1/28/2020 Change Order 19
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 1/28/2020 Change Order 20
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 1/8/2021 Change Order 24
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 10/11/2018 Change Order 5
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 10/19/2017 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 11/13/2018 Change Order 5
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 11/13/2018 Change Order 7
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 11/9/2020 Amendment 25
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 12/4/2018 Change Order 8
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 12/4/2018 Change Order 9
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 12/5/2018 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 3/26/2019 Change Order 10
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 3/26/2019 Change Order 11
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 4/1/2020 Change Order 21
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 4/28/2020 Change Order 22
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 5/1/2019 Change Order 12
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 5/30/2018 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Construction Inc. 7/19/2021 Change Order 26
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
INTERWEST CONSTRUCTION INC. 7/9/2019 Change Order 13
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Interwest Constuction Inc 5/4/2020 Change Order 23
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 instructions if determined necessary. Do not paint the elastomeric bearing pads. <br /> 2 The steel pipes extending below elevation 17.17 and continuing to the buried <br /> 3 flex joint shall not be painted. The corrosion protection for the unpainted steel <br /> 4 pipe portion is called out on the civil plans (C4.1). Do not bury the pipes without <br /> 5 application of the specified corrosion protection. <br /> 6 10. Nuts, bolts and washers shall be painted at all locations where connecting to a <br /> 7 Grade 50 painted surface. <br /> 8 11. Nuts, bolts and washers shall be Type 3 black weather at all locations where <br /> 9 connecting to Grade 50W unpainted surface. <br /> 10 12.Anchor bolts, nuts, and washers shall be hot-dipped galvanized. <br /> 11 13. Paint black all steel associated with the bird screen covers. See S3.53. <br /> 12 <br /> 13 Section 6-07 is supplemented with the following: <br /> 14 <br /> 15 (******) <br /> 16 6-07.6 ARCHITECTURAL PAINTING AND COATINGS <br /> 17 <br /> 18 6-07.6(1) Description <br /> 19 This work consists of providing and application of paint and coatings on architectural <br /> 20 components. These components include, but are not limited to the following: <br /> 21 <br /> 22 Concrete Elevator Tower, Exterior <br /> 23 Door and Door Frames <br /> 24 Concrete Floor, Utility Room and Elevator <br /> 25 <br /> 26 Work includes all, equipment and related material needed to facilitate installation in <br /> 27 accordance with these Specifications and as shown on Plans or directed by the <br /> 28 Engineer. <br /> 29 <br /> 30 6-07.6(2) Materials <br /> 31 Materials shall meet the requirements of the following sections: <br /> 32 <br /> 33 Paint <br /> 34 Glidden Professional <br /> 35 Devoe Performance Coatings <br /> 36 Benjamin-Moore <br /> 37 Kelly-Moore Paints/Rust-Oleum <br /> 38 Sherwin Williams <br /> 39 or approved equal manufacturer <br /> 40 <br /> 41 Anti-Graffiti (Concrete) Coating <br /> 42 Type: RTV silicone rubber water repellent and graffiti protectant. <br /> 43 Color: Clear <br /> 44 Active Substance: Silicone rubber based formulation <br /> 45 Volume Solids: 15% by weight. <br /> 46 Solvent: Water <br /> 47 Flash Point: 103 degrees F. <br /> 48 Density: 6.8 lbs/gal. <br /> 49 VOC: 0.97 g/I, maximum per EPA for National Volatile Organic Compound <br /> 50 Standards for Architectural Coatings, (Rule 40 CFR Part 59). <br /> 51 <br /> 52 Basis of Design: or approved equal <br /> CITY OF EVERETT <br /> GRAND AVENUE PARK BRIDGE May 18,2017 <br /> WO#3588 S158 <br /> age 11 <br /> Provided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com-Always Verify Scale <br />
The URL can be used to link to this page
Your browser does not support the video tag.