My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2300 KASCH PARK RD PAVEMENT MAINTENANCE AND RENOVATION 2022-02-17
>
Address Records
>
KASCH PARK RD
>
2300
>
PAVEMENT MAINTENANCE AND RENOVATION
>
2300 KASCH PARK RD PAVEMENT MAINTENANCE AND RENOVATION 2022-02-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2022 4:08:43 PM
Creation date
8/1/2017 9:15:24 AM
Metadata
Fields
Template:
Address Document
Street Name
KASCH PARK RD
Street Number
2300
Tenant Name
PAVEMENT MAINTENANCE AND RENOVATION
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table of Contents , <br />1 . Introduction.....................................................................................................................................1 <br />2 ■ Existing Drainage...........................................................................................................................2 <br />3. Conditions and Requirements Summary.....................................................................................2 <br />Minimum Requirement No. 1: Preparation of Stormwater Site Plans.............................................6 <br />Minimum Requirement No. 2: Construction Stormwater Pollution Prevention...............................6 <br />Minimum Requirement No. 3: Source Control of Pollution.............................................................6 <br />Minimum Requirement No. 4: Preservation of Natural Drainage Systems and Outfalls.................6 <br />Minimum Requirement No. 5: On -Site Stormwater Management...................................................6 <br />Minimum Requirement No. 6: Runoff Treatment............................................................................6 <br />4. Off -Site Analysis.............................................................................................................................6 <br />UpstreamDrainage Area..................................................................................................................6 <br />DownstreamAnalysis.......................................................................................................................7 <br />Downstream Drainage Complaints................................................................... ..............................7 <br />5 ■ Proposed Drainage Control.........................................................................................................21 <br />StormwaterManagement...............................................................................................................21 <br />BioSwale......................................................................................................................................... <br />21 <br />Contech Stormfilter Vault...............................................................................................................21 <br />6. Water Quality Treatment..............................................................................................................22 <br />BioSwale......................................................................................................................................... <br />22 <br />Contech StormFilter Vault..............................................................................................................22 <br />7 ■ Conveyance..................................................................................................................................22 <br />8. Temporary Erosion and Sedimentation Control.......................................................................23 <br />9 ■ Drainage System Maintenance...................................................................................................23 <br />Temporary Erosion/Sedimentation and Drainage Report — Community Transit <br />V <br />
The URL can be used to link to this page
Your browser does not support the video tag.