My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2300 KASCH PARK RD PAVEMENT MAINTENANCE AND RENOVATION 2022-02-17
>
Address Records
>
KASCH PARK RD
>
2300
>
PAVEMENT MAINTENANCE AND RENOVATION
>
2300 KASCH PARK RD PAVEMENT MAINTENANCE AND RENOVATION 2022-02-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2022 4:08:43 PM
Creation date
8/1/2017 9:15:24 AM
Metadata
Fields
Template:
Address Document
Street Name
KASCH PARK RD
Street Number
2300
Tenant Name
PAVEMENT MAINTENANCE AND RENOVATION
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
List of Figures <br />Figure1-1: Vicinity Map................................................................................................................................1 <br />Figure3-1: DOE SMMWW Figure 2.4.2.......................................................................................................3 <br />Figure3-2: COE SMM Figure 2.1.................................................................................................................4 <br />Figure3-3: COE SMM Figure 2.2.................................................................................................................5 <br />Figure 4-1: On -Site and Off -Site Drainage Map...........................................................................................8 <br />Figure 4-2: 4-Inch Inlet Pipe into West End of Bioswale............................................................................10 <br />Figure 4-3: Bioswale — Provides Water Quality Treatment along Southern Edge of Parking Site.............10 <br />Figure 4-4: Catch Basin at Downstream End of Bioswale..........................................................................11 <br />Figure 4-5: 8 inch HDPE Outfall Pipe from Bioswale into Wetland 3.........................................................11 <br />Figure 4-6: Looking East into Wetland 3 — Downstream of 8 inch HDPE Outfall Pipe from Bioswale ....... <br />12 <br />Figure 4-7: Looking Northeast at 24-Inch HDPE Pipe Outfall into Wetland 3 — <br />Located to the North of 8 inch HDPE Outfall Pipe from Bioswale...........................................12 <br />Figure 4-8: Looking Northeast at 30-Inch HDPE Overflow Pipe Outfall into Wetland 3 — <br />Located at Northwest corner of Wetland 3...............................................................................13 <br />Figure 4-9: Looking East along Wetland 3.................................................................................................13 <br />Figure 4-10:Looking East along Wetland 3 — Towards Kasche Park..........................................................14 <br />Figure 4-11:Looking West at Beaver Deceiver............................................................................................14 <br />Figure 4-12:Looking at 30-Inch Concrete Culvert Inlet — <br />Conveys Runoff East Beneath Kasch Park Rd towards Kasch Park......................................15 <br />Figure 4-13:Looking West at Drainage Structure in Parking Island of Kasch Park.....................................16 <br />Figure 4-14:Looking East toward Grass Lined Open Trapezoidal Channel in Kasch Park ........................16 <br />Figure 4-15:Looking West toward 30-Inch Concrete Culvert Inlet into Grass Lined Open <br />TrapezoidalChannel................................................................................................................17 <br />Figure 4-16:Looking East along Grass Lined Open Trapezoidal Channel in Kasch Park ..........................17 <br />Figure 4-17:Looking East at Outfall of Open Trapezoidal Channel into 12 inch HDPE Culvert to <br />DrainageStructure...................................................................................................................18 <br />Figure 4-18:Looking South at 30-Inch Concrete Inlet to Concrete Rectangular Open Channel and <br />Upstream Drainage Structure..................................................................................................18 <br />Figure 4-19:Looking South at 30-Inch Concrete Inlet into Concrete Rectangular Open Channel ..............19 <br />Figure 4-20:Looking North along Concrete Rectangular Open Channel....................................................19 <br />Figure 4-21:Looking North along Concrete Rectangular Open Channel....................................................20 <br />Figure 4-22:Looking East along Runoff Flow Path into Loganberry Lane Park Wetland ............................20 <br />List of Tables <br />5-1: Site Area Summary ..............................................................................................................................21 <br />KPFF Consulting Engineers <br />A <br />
The URL can be used to link to this page
Your browser does not support the video tag.