My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2300 KASCH PARK RD PAVEMENT MAINTENANCE AND RENOVATION 2022-02-17
>
Address Records
>
KASCH PARK RD
>
2300
>
PAVEMENT MAINTENANCE AND RENOVATION
>
2300 KASCH PARK RD PAVEMENT MAINTENANCE AND RENOVATION 2022-02-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2022 4:08:43 PM
Creation date
8/1/2017 9:15:24 AM
Metadata
Fields
Template:
Address Document
Street Name
KASCH PARK RD
Street Number
2300
Tenant Name
PAVEMENT MAINTENANCE AND RENOVATION
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT <br />City of Everett Public Works Department <br />3200 Cedar Street <br />Everett, WA 98201 <br />(425) 257-8810 <br />OWNER NAME AND ADDRESS: <br />SNOHOMISH CO PUBLIC TRANS <br />BENEFIT AREA CORP <br />EVERETT WA 98204-1462 <br />Date: 4/6/2015 <br />Public Works Permit #: PW1504-013 <br />Buildinq Permit #; <br />Planninq Reference #: <br />Public Works Fee $: $ 5,414.06 <br />Other $: <br />APPLICANT NAME AND ADDRESS: <br />DAUBENMIRE LARRY <br />7100 HARDESON RD <br />EVERETT WA 98203 <br />PHONE: I PHONE: -4Z 19 349 ^Z393 <br />TAX PARCEL ID # 28041400203300 1 SITE ADDRESS: 2300 KASCH PARK RD <br />DESCRIPTION OF PROPOSED WORK: <br />RESURFACE PARKING LOT, UPGRADE STORMWATER TREATMENT FACILITY <br />PERMIT CONDITIONS <br />1. All calls for inspection shall be made 24 hours in advance. <br />2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br />and Specifications. <br />3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 <br />4. Work to be done per approved plans dated 04-07-2015 <br />5. Community Transit is responsible for doing detailed/special inspection on the pavement as they see fit. The 5Mtylz <br />w <br />will not be checking thickness, reinforcement, grades, Etc. <br />6. Please contact the construction Inspector at 425-339-7404 for a Pre -Con meeting beforeMeg a- iQ iWA. <br />L•J m <br />proved for Cb struction Date <br />FINAL INSP CTI ate <br />Approved as Cons ruc ed <br />! <br />i <br />> <br />I�� iyt <br />•Efi! .y�. <br />O <br />r ° F <br />C_ j <br />r i r_n <br />- i C <br />J O <br />IX) <br />!J3 <br />i..31 <br />ACKNOWLEDGEMENT OF CONDITIONS <br />The undersigned owner/applicant hereby agrees to hold and <br />save harmless the City of Everett from any and all claims for <br />damages, costs, expenses, or causes of action that may arise <br />because of installation and maintenance of the improvement <br />or other right-of-way use hereto applied for and further agrees <br />to remove same upon notice from the City and to replace <br />public property damaged thereby. <br />Z'U4 Q' �) _ / ':�- <br />(24 <br />Signature of Applicant Date <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br />PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.