Laserfiche WebLink
17 <br />conserttinp Engrrea.s <br />!6o, Fi cA A,.,mj#; S,,Jfe f&40 50*V+0. LVA NSf07 <br />ac46 ft2 -.,.v2 tat ao6) #22-9'3(1 <br />Client: Community Transit <br />Project: Kasch Park Operations Base <br />kpff #: 114239 <br />By: TAK, LAW <br />Date: December 19, 2014 <br />Engineer's Estimate of Probable Cost Estimated % Complete 60% <br />PROJECT CONSTRUCTION COST <br />SUMMARY ; <br />.......... <br />Estimated <br />Estimated <br />Estimated <br />Cost wo/ <br />Cost w/10% <br />Cost w/20% <br />Design <br />Design _ <br />Design <br />%of Total <br />Improvement (by -PC priority) <br />Contingency <br />Summation <br />Contingency <br />Contingency <br />Cost <br />Pavement Jointing <br />$155,000 <br />$155,000 <br />$170,500 <br />$186,000 <br />4.2% <br />Pavement Maintenance <br />$316,000 <br />$471,000 <br />$347,600 <br />$379,200 <br />8.5% <br />Area L and M <br />$201,000 <br />$672,000 <br />$221,100 <br />$241,200 <br />5.4% <br />Area B <br />$483,000 <br />$1,155,000 <br />$531,300 <br />$579,600 <br />13.0% <br />Area P <br />$410,000 <br />$1,565,000 <br />$451,000 <br />$492,000 <br />11.0% <br />Area H <br />$477,000 <br />$2,042,000 <br />$524,700 <br />$572,400 <br />12.8% <br />Area K <br />$421,000 <br />$2,463,000 <br />$463,100 <br />$505,200 <br />11.3% <br />Water Quality Facility <br />$102,000 <br />$2,565,000 <br />$112,200 <br />$122,400 <br />2.7% <br />Area D <br />$499,000 <br />$3,064,000 <br />$548,900 <br />$598,800 <br />13.4% <br />Area Q <br />$663,000 <br />$3,727,000 <br />$729,300 <br />$795,600 <br />17.8% <br />Total Const Cost <br />$3,727,000 <br />$4,099,700 <br />$4,472,400 <br />100.0% <br />Const. Contingency 5% <br />$186,350 <br />$204,985 <br />$223,620 <br />Survey and Engineering* 5% <br />$186,350 <br />$204,985 <br />$223,620 <br />Const. Management* 5% <br />$186,350 <br />$204,985 <br />$223,620 <br />Agency Administration* 2% <br />$74,540 <br />$81,994 <br />$89,448 <br />Project Total Cost $4,360,590 $4,796,649 $5,232,708 <br />Notes: Unit prices provided by GSG Group and WSDOT Unit Bid Price History <br />Costs do not include Washington State sales tax. <br />Page 1 of 21 <br />