My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5109 SOUND AVE 2017-08-02
>
Address Records
>
SOUND AVE
>
5109
>
5109 SOUND AVE 2017-08-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2017 1:15:47 PM
Creation date
8/2/2017 1:15:31 PM
Metadata
Fields
Template:
Address Document
Street Name
SOUND AVE
Street Number
5109
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
July 21, 2014 <br /> Two Single-Family residences <br /> L&A Job No. 14-065 <br /> Page 10 <br /> SITE PREPARATION AND GENERAL GRADING <br /> Vegetation within construction limits should be cleared and grubbed, while vegetation <br /> outside of construction areas should be protected and maintained. Loose topsoil, <br /> disturbed soil, and weak weathered soil should be completely stripped down to hard silt <br /> and/or medium-dense sand deposit within building pads of the proposed new residences. <br /> The exposed soils should be compacted to a non-yielding state with a vibratory compactor <br /> and proof-rolled with a piece of heavy earthv��ork equipment. <br /> EXCAVATION AND FILL SLOPES <br /> Under no circumstance should excavation slopes be steeper than the limits specified by <br /> local, state and federal safety regulations. Unsupported temporary cuts greater than 4 feet <br /> in height should be no steeper than 1H:1V in topsoil, disturbed soil, and weathered soil, <br /> no steeper than 3/4H:1 V in the medium-dense advance outwash sand soil, and no steeper <br /> than 1/2H:1V in the hard Whidbey formation silt soil. Permanent cut banks should be no <br /> steeper than 2-1/4H:1 V in topsoil, disturbed soil and weathered soil, and no steeper than <br /> 1-1/2H:1V in the underlying medium-dense advance outwash and hard silt soils. The soi] <br /> units and the stability of cut slopes should be observed and verified by a geotechnical <br /> engineer during excavation. <br /> Pernianent fill embankments required to support structural or traffic load should be <br /> constructed with compacted structural fill placed over undisturbed, proof-rolled, firm, <br /> native soil after the surficial unsuitable soils are completely stripped. Permanent fill to be <br /> placed over slopes steeper than 15 percent grade should be retained structurally. The <br /> exposed ground exceeding 20 percent grade should be benched with vertical steps not <br /> LIU & ASSOCIATES, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.