My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5109 SOUND AVE 2017-08-02
>
Address Records
>
SOUND AVE
>
5109
>
5109 SOUND AVE 2017-08-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2017 1:15:47 PM
Creation date
8/2/2017 1:15:31 PM
Metadata
Fields
Template:
Address Document
Street Name
SOUND AVE
Street Number
5109
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
July 21, 2014 <br /> Two Single-Family residences <br /> L&A Job No. 14-065 <br /> Page 11 <br /> exceeding 4 feet high after stripping of surficial unsuitable soils and prior to placing <br /> structural fill. The slope of pertnanent fill embankments should be no steeper than 2- <br /> 1/4H:1 V. Upon completion, the sloping face of permanent fill embankments should be <br /> thoroughly compacted to a non-yielding state with a hoe-pack. <br /> The above recommended cut and fill slopes are under the assumpiion that groundwater <br /> seepage would not be encountered during construction. If groundwater is encountered, <br /> the construction work should be immediately halted and the slope stability re-evaluated. <br /> The slopes may have to be flattened and other measures taken to sta.bilize the slopes. <br /> Stormwater should not allowed to flow uncontrolled over cut and fill slopes. Permanent <br /> cut slopes and fill embankments should be seeded and vegetated as soon as possible for <br /> erosion protection and long-term stability, and should be covered with clear plastic sheets, <br /> as required, to protect them from erosion until the vegetation is fully established. <br /> STRUCTURAL FILL <br /> Structural fill is the till that supporls structural or traffic load. Structural fill should <br /> consist of clean granular soils free of organic, debris and other deleterious substances and <br /> with particles not larger than three inches. Structural fill should have a moisture content <br /> within one percent of its optimum moisture content at the time of placement. The <br /> optimum moisture content is the water content in the soils that enable the soils to be <br /> compacted to the highest dry density for a given compaction effort. Onsite clean soils <br /> meeting the above requireinents may be used as structural fill. Imported material to be <br /> used as structural fill should be clean, free-draining, granular soils containing no more <br /> LIU & ASSOCIATES, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.