My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5109 SOUND AVE 2017-08-02
>
Address Records
>
SOUND AVE
>
5109
>
5109 SOUND AVE 2017-08-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/2/2017 1:15:47 PM
Creation date
8/2/2017 1:15:31 PM
Metadata
Fields
Template:
Address Document
Street Name
SOUND AVE
Street Number
5109
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
July 21; 2d 14 <br /> Tvvo Single-Family residences <br /> L&A Job No. 14-065 <br /> Page 12 <br /> than 5 percent by weight finer than the No. 200 sieve based on the fraction of the material <br /> passing No. 4 sieve, and should have individual particles not larger than three inches. <br /> The ground over which structural fill is to be placed should be prepared in accordance <br /> with recommendations in the SIT� PREPARA"I'ION AND GENERI�L GRADING and <br /> �XCAVATION AND FILL SLOPES sections of this report. Structural fill should be <br /> placed in lifts no more than 10 inches thick in its loose state, with each lift compacted to a <br /> minimum percentage of the maximum dry density determined by ASTM D1557 <br /> (Modified Proctor Method) as follows: <br /> Application % of M�imum Dry Densitv <br /> Within building pads and under foundations 95% <br /> Roadway/driveway subgrade 95% for top 3 feet and 90% below <br /> Retaining/foundation wall backfill 92% <br /> Utility trench backfill 95% for top 4 feet and 90% below <br /> RETAINING WALL <br /> The hillside in the southeast quadrant of the project site may be stabilized with a retaining <br /> wall constructed along the toe of the hillside. Seepage out of the hillside may cause <br /> erosion and slide. Therefore, toe cut and construction of retainin� wail should proceed <br /> and be completed in the driest time between May 1 and October 31. Retaining wall may <br /> consist of a cast-in-place, reinforced concrete wall or a soldier pile wall. <br /> LIU & ASSOCIATES, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.