Laserfiche WebLink
H. High Street - 38th Street to 41st Street <br /> Replace broken and cracked sidewalks as needed on both sides of <br /> the street. <br /> I. 33rd Street - Lombard Avenue to Broadway Street <br /> Construct new curb and sidewalk and pave graveled parking area on <br /> the north side of 33rd Street. <br /> J. Wall Street - Bond Street to Federal Avenue <br /> Replace existing curb, gutter, and sidewalk on the north side of <br /> the street including minor street widening and landscaping. <br /> II. The Mayor be instructed to have a Plans and Systems ordinance prepared <br /> and presented to the City Council which will officially authorize and <br /> fund the development of contract plans, specifications, and detailed <br /> cost estimates for the improvements listed above. <br /> III. Should costs be less for the above projects than was originally <br /> estimated, projects receiving the next highest priority shall be <br /> initiated. If project costs exceed the estimates given, the lowest <br /> priority project or projects shall be dropped. <br /> (90Councilman Intro ucing Resolution <br /> Passed and approved this 75 day of A,ode,,L , 1984. <br /> 40 <br /> Council President <br />